Paul Revere Williams 

Through Time

The Timeline illustrates how material history, society and the work of one person, Paul R. Williams, integrate and interact. Small changes in society, architecture or life may seem inconsequential, but when connected a powerful picture emerges. The Timeline illustrates how many forces shape our modern life. Williams’ life did not form in isolation but was a product of complex energies in society, his profession and within himself.

 

 

Timeline

Choose a Time Period

1950s

Decade at a Glance

The population grew to 151,684,000 people. Over 3-million people were still unemployed. With improved nutrition, medical discoveries and better-managed public health, life expectancy increased for all segments of the population.

The average American annual wage was $2,992 and men out-number women in the labor force 5/2.

Over 6 million cars were sold.

National television began in 1951 when a speech by President Harry Truman was broadcast. Soviet Nikita Khrushchev and Vice President Nixon debatedon television in this photo.

The Supreme Court rules segregation in public schools was unconstitutional. Rosa Parks refused to give up her seat on a public bus in Montgomery, Alabama. The Civil Rights Movement began .

Jonas Salk discovered a vaccine for polio and immunization programs save children and adults from diseases once considered common.

Domestic passenger jet service began and the first U.S. satellite orbited the earth.

Alaska and Hawaii became states in the Union.

The Patio Home on Display at Los Altos Park

Los Angeles Times, February 26, 1950

“Featuring one of the tallest planting boxes on record, The Patio home, designed by Architect Paul R. Williams, is now on display in Los Altos Park … the planting box, in front of the residence, reaches just below the boxed eaves. The interior of the box forms the wardrobe for the front bedroom.”

S. R. Crown Hall, Chicago, Illinois

The Illinois Institute of Technology waslocated near the South Side of Chicago. With a “master-planned” campus designed specifically for an urban setting, the university was known for its outstanding architecture. Ludwig Mies van der Rohe was director of the architecture program from 1938-1958 and designed 19 of the 55 campus buildings. S.R. Crown Hall (1950) was considered an icon of his philosophy of a universal building type later called Miesian-style. It was a significant design departure from his earlier campus designs. Crown Hall, an example of the 20th century Modernist movement, emphasized the synthesis of technology, materials, detailing and design.

Mies van der Rohe designed Crown Hall as a two-level, rectangular structure with industrial simplicity. The building’s sole ornamentation was the exposed, black-painted steel frame filled with large sheets of glass of varying transparency. On the top level, the architect created an open, unobstructed, flexible work space that encouraged collaboration and cooperation between students and faculty. Mies van der Rohe described this pavilion-like design as a universal space. The lower level contained rooms for building services/operations, bathrooms, administrative offices, wood and model shops and smaller lecture rooms.

One of the most important architects of the 20th century, Mies van der Rohe considered S.R. Crown Hall an “exceptional” precedent for the buildings he would design. He wrote that this Hall is “the clearest structure we have done, the best to express our philosophy.” The building was added to the Park Services’ National Register of Historic Places.

Paul Williams Designs Ultra Modern Home Furnishing Store

The March 1951 issue of Architect and Engineer described Paul Williams’ design for the new Beverly Hills branch of the W. J. Sloane store. The magazine described the five-story building on Wilshire Blvd as having “many merchandising and display facilities that are unique in the home furnishing field.” (This photograph is a typical staged Sloane room decorated with m erchandise from the store.) His design work for this store started in 1948 and was completed in 1951. It included window displays that could be positioned into place by elevators, underground parking for 150 cars and a model home built within the store “that will feature the latest in correlated groupings of all types of furnishings.”

The store was built by Del E. Webb Construction Company and was an example of their collaborative work with Paul R. Williams.

Honored in Community

Williams, along with two others, was honored at a banquet sponsored by the National Conference of Christians and Jews. He was recognized for his efforts to promote brotherhood in the Los Angeles community. “Williams, an internationally known architect, is a member of the board of directors of 14 organizations and corporations and is known for his interests in the YMCA and the Boy Scouts of America.” (Los Angeles Times, December 12, 1951)

Paul Williams To Help Design Courthouse

Jet, November 22, 1951

“Internationally famous architect Paul Williams has been selected among four architects to design a new Los Angeles courthouse. They will split a fee of 6-1/2 per cent of the total cost.”

Jolson Monument Approved By Court

Los Angeles Times, February 8, 1951

Memorial First Proposed by Singer’s Widow Will Take $84,000 from Funds of Estate

“The monument designed by Paul R. Williams, Los Angeles architect, will cost $75,000 … ‘I wouldn’t like to see this order become a precedent,’ said the judge in approving the petition. ‘But in this case involving a man so well known as Mr. Jolson I believe the expenditure is justified.’”

Moves to Lafayette Square

Williams designed and built a home for his family in the upper-middle-class Lafayette Square neighborhood of Los Angeles. Lafayette Square was home to many influential people in Los Angeles and by midcentury opened up to affluent African American professionals. Williams lived in this home until his death in 1980. This house was designated a historic and cultural landmark in Los Angeles County.

1951

1952

Awarded Honorary Degree from Howard University

Delegations for President Listed

Community Leaders Back School Bond Vote

Memorial to “Unknown Sailor”

Why “Passing” Is Passing Out

United Nations Headquarters, Manhattan, New York

1953

1954

Warren Breaks Ground for New Courthouse

‘Bright Road’ Producer Gets Carver Merit Plaque

State sponsored segregation unconstitutional

Hospital projects

Hollywood Knickerbocker Hotel Renovation

Awarded Spingarn Medal

Mr. and Mrs. Paul R. Williams Assist Ralph Edwards on “This Is Your Life”

Paul Williams Named L.A. City Commissioner

President Picks L.A. Architect

Forum Discusses Industry and Art

New York Times, October 20, 1953 Speakers for Herald Tribune Debate Effects of Machine Age on Cultural Values

“Speakers at yesterday’s session, the second this year, included Henry Dreyfuss, industrial designer; Paul R. Williams, architect; Arthur A. Houghton Jr., president of Steuben Glass, Inc.; Charles E. Odegaard, dean of the College of Literature, Science and Arts at the University of Michigan; and Francis Henry Taylor, director of the Metropolitan Museum of Art.”

Our New Domestic Architecture

Danny Thomas Hospital Dream Nearing Reality

Lilien Residence

Architectural Digest, 1955

A Maynard Parker photograph of a detail in Mr. & Mrs. Aaron Lilien’s dining room, Brentwood, CA, was featured in the magazine. Williams wored with interior decorator Harriet Schellenberger on the Lilien house. (Huntington Library, San Marino CA)

Rosa Parks refuses to give up seat on bus

On December 1, 1955, Rosa Parks refused to give up her seat to a white male passenger on a Montogomery, Alabama bus and was arrested for this act of civil disobedience. After her arrest, a boycott of the city bus line started and lasted for 381 days. Martin Luther King, Jr. was appointed spokesperson for the boycott. Protests spread across the South demanding racial equality. Because of this defiant act, Parks was recognized as “mother of the modern civil rights movement” in America.

1955 photograph of Rosa Parks with Martin Luther King in the background. National Archives and Records Administration Records of the U.S. Information Agency Record Group 306.

Wins award for service

Wisdom Magazine selected important Americans to receive an award for “contributions to knowledge and distinguished service to mankind.” On the cover of its first issue in 1956 the magazine featured Albert Einstein. Williams was among the distinguished recipients of the magazine’s first award.

Other honorees that evening included: Bernard Baruch, advisor to Presidents and international financier; Eddie Cantor, comedian; Dr. Will Durant, historian and intellectual; Conrad Hilton, hotelier; Richard Neutra, architect; Pearl S. Buck, Nobel prize winning novelist; Maxwell Anderson, playwright; Richard Rodgers and Oscar Hammerstein, Broadway team.

Winston Churchill and Bernard Baruch pictured here were also featured on the cover of Wisdom Magazine.

Tuskegee Institute Confers Honorary Degree

In celebration of the Diamond Jubilee Celebration at Tuskegee Institute, Williams was honored with an honorary degree Doctor of Fine Arts. In a 1957 letter from the Institute President, L. H. Foster, Williams was described as “…one of the persons in America who is doing outstanding work and who is measuring up fully to the highest traditions of their professions.”

Golden Crown to Be Placed on City Hall

Los Angeles Times, March 6, 1956

“The City Hall will have a golden crown emblematic of Los Angeles’ standing as a monarch among cities because of its rank, power, and attractions, the Municipal Arts Commission decided yesterday.

The 32-foot pyramid atop the 454-foot building will be cover with aluminum sheets to waterproof the tower. At the suggestion of its president, Paul R. Williams, the commission said this facing should be painted gold.”

Photographer Brion Vibber.

Elvis an international sensation

On September 9, 1956, entertainer Elvis Presley appeared for the first time on Ed Sullivan’s television show. Early in his career Elvis became an international sensation. His unique music combined a variety of styles: white country and gospel, black R&B and gospel, and white pop. Elvis’ fans came from every social class and age group. His music changed the face of American popular culture for decades and influenced many famous musicians.

Elvis Presley got his break into the music business at Sun Studio (Memphis Recording Services in 1954) owned by Sam Phillips. Reputedly the first rock-and-roll single, Jackie Brenston and his Delta Cats’ Rocket 88, was recorded here in 1951.

1955

1956

1957

1958

1959

Elected to College of Fellows American Institute of Architects

In an April 2, 1957, letter from the Executive Secretary of AIA, Williams was offered the honor of Fellowship and membership in the College of Fellows “for your notable contribution in Public Service.”

Excerpts from letters supporting his nomination include:

Graham Latta, Los Angeles Architect, July 1957 “…Paul’s achievements in Architectural design should not go unnoticed. Over the many years that I have been familiar with his work, I have become aware that it is consistently good, often with a personal touch that makes it recognizable without seeing his name.”

Adrian Wilson, Los Angeles Architect, January 1957 “I know him to be exceptionally well qualified as a designer…as an individual he is tactful, courteous, considerate and honest. The quality of his work follows suit.”

In a subsequent letter to an American ambassador, the AIA Executive Secretary wrote about Williams: “He has been a member of The American Institute of Architects since 1923 and a year or so ago he was advanced to Fellowship in The Institute and is now a member of our College of Fellows. He is the first negro to be so honored.”

Negro Architect Builds Sinatra Home

Ebony, January 1957 Paul Williams Designs Showplace for Singer

“When singer Frank Sinatra unveiled his new Hollywood home on Person to Person, millions of televiewers oohed and aahed. Overnight, the house became the talk of the country, establishing architect Paul R. Williams as the master of the small house field. … ‘Being a bachelor,’ Sinatra told him, ‘I don’t want a large house. Just something small and livable.’”

1960 photograph of Frank Sinatra with former First Lady Eleanor Roosevelt, National Archives.

Negro Leaders Form $30 Million Insurance Firm

Jet, December 12, 1957

“A $30 million life insurance firm to be operated on a nationwide basis and place special emphasis on better housing for Negroes, was formed by Negro leaders in Denver, Colo. Temporarily named National Equality Life, the new organization will be largely owned and operated by Negroes. The directors are architect Paul Williams of Los Angeles…”

Seagram Building, New York

In a 1958 review, the magazine Architectural Forum called the newly opened Park Avenue headquarters for the Seagram Liquor Company “a half-million square foot laboratory in which new and special office designs are tested in actual use.” The building embodied architect Mies van der Rohe’s philosophy that “structure is spiritual” and “less is more.” The Seagram became a 20th century symbol of corporate power and a model for other company headquarters.

Mies van der Rohe wored with designer Philip Johnson to create the 38-story, stainless-steel and glass building. With bronze-clad pillars and floor-to-ceiling tinted glass, the building appeared as a curtain wall to passers-by. The Seagram Building revolutionized the architectural design of skyscrapers. With smooth glass lines, the building was a total break from the “wedding cake” style of the Empire State or Chrysler Buildings. Mies van der Rohe included a public plaza with fountains as an integral part of his design. This concept changed New York City building codes and the definition of successful public spaces.

Selected to design Church of Religious Science

Dr. Earnest Holmes, Church of Religious Science founder, selected Paul Williams as the architect for their new round church in Los Angeles. Dr. Holmes suggested that the Devil can’t hide in the corners of a round building.

In this 1958 Jet photograph, Williams viewed a rendering of the church with Dr. Earnest Holmes.

New UCLA Botanical Structure Started

Los Angeles Times, May 4, 1958

“The four-story structure will be located in one of the Southland’s most beautiful botanical gardens … Paul R. Williams is executive architect … expected completion date for the Botany Building project is June 1, 1959.”

State Department Job

Jet, February 6, 1958

“Architect Paul Williams, a GOP showcase figure, was nixed for State Dept. architectural job. Reason: not enough experience.”

Kreis Announces Opening of New Signature Room

Desert Sun March 14, 1958

“Milton F. Kreis has announced the opening of his new Signature Room in the Oasis Building…The plush new restaurant and cocktail lounge was designed and executed by the world-famous architect, Paul R. Williams and features many firsts.”

Washington Dulles International Airport, Fairfax, Virginia

To meet the growing demand for more airport capacity in the Washington, D.C. area, the U.S. Congress passed the Washington Airport Act of 1950. A 10,000-acre site in Fairfax and Loudoun Counties was selected and planning began for the new Dulles International Airport. The engineering firm Ammann and Whitney coordinated planning and construction. Finnish born and trained at Yale University, Eero Saarinen was chosen to design the iconic passenger terminal. Construction began in 1958 and took six years to complete.

Saarinen’s design was the first facility designed with modern jet travel in mind. His philosophy of “the Style for the job” allowed the nature of a project to dictate the architectural style. Hoping to convey “the soul of the airport,” the architect’s elliptical Modernist form appeared to lift-off, dramatically conveying the building’s function as an international travel gateway. Saarinen believed his design was “the best thing I have ever done.” In 1966, the terminal building was awarded AIA’s First Honor Award.

Predicts Americans return to urban life

Speaking at the 1959 annual meeting of the National Society of Interior Designers, Williams predicted that in 10 years “people will start coming back to the city to live and will want a home designed around business and social activity.” He described the future of housing as revolutionary. The home of the 1970s … “will possibly feature windowless walls on the street side with all rooms facing inward, and it would also have a filtered, circulating air system to escape the smog…”. (Los Angeles Times, October 20, 1959)

This prediction for the future represented a change in consumer behavior from that previously described in his book New Homes for Today (1946). In this book, Williams predicted that the new homeowner would “buy ground farther from the city where lots are larger. This added area would allow space for family activities” … and provide additional privacy.

A successful architect was always aware of changes in consumer behavior. This 1960s floorplan for the SeaView development illustrated how Williams redirected the living area of the home from the public street to the privacy of the backyard—what the new consumer wanted.

Community Service Center opens in Los Angeles

Los Angeles welcomed more than 500 new residents every day including 90 African Americans. To facilitate their search for housing and jobs, a Community Service Center opened on Western Street. The center was supported by the local Republican Party. Paul Williams chaired the Center’s executive board. (Jet)

A Personal Message to You from Dr. Martin Luther King, Jr.

Jet advertisement, October 22, 1959

“I am proud to be a Director of International Opportunity because it is America’s first integrated life insurance company. Working with me, and sharing this great experience in human rights, are Nat ‘King’ Cole, Jesse Owens, Paul R. Williams, Dr. M.C. Williams and many other great Americans—men who believe in equal opportunity for all people. Together—we are now able to bring to every family the protection and privilege of buying the very finest insurance…”

Stahl House, West Hollywood, California

In 2007, the American Institute of Architects (AIA) announced the list of America’s 150 favorite architectural sites. The Pierre Koenig designed Stahl House was one of only a hand-full of California buildings to make the list. Originally commissioned in 1959 as a Case Study House, this 2,200 square-foot Hollywood Hills residence quickly became a Los Angeles icon. Photographs of the house are used in more than 1,200 newspaper and magazine articles and the residence was the setting for scores of movies and commercials.

Koenig designed the modern, steel frame and glass house for Buck Stahl, a former professional football player. Architect and athlete collaborated in creating the client’s dream—a home with a 270 degree “completely unobstructed view of the mountains to the sea.” (Los Angeles Times, June 27, 2009) To provide an unobstructed view, Koenig used the largest sheets of glass available in the 1950s, creating a house that seemed to float in its environment.

Solomon R. Guggenheim Museum, New York

1960s

Decade at a Glance

The U.S. population reached 177,830,000. The average life expectancy for men and women was 66+ years. More than 850,000 war babies entered college. State universities, including the California system, began huge expansion programs to accommodate the incoming war babies.

The average wage was $4,743 and a teacher’s yearly salary was $5,174. The minimum wage increased to $1 per hour.

Car-related deaths increased to 21.3 per 100,000. Ralph Nader’s book Unsafe at Any Speed changed the public’s perception of auto safety.

Social philosopher Marshall McLuhan promoted the idea of mass communication as the driving force of a new “global village.”

Men’s hair was longer and women’s dresses were shorter. Polyester Nehru jackets, wide ties, miniskirts, go-go boots, beads and colorful t-shirts were the fashion.

The Black Panthers, the United Farm Workers Association, the hippie movement, Viet Nam War protestors and the National Organization for Women were all important catalysts for social change in the U.S.

The publication of Rachael Carson’s book Silent Spring marked the beginning of the environmental movement.

America’s Armstrong and Aldrin walked on the moon.

Williams active in Republican Politics

In the 1960 Presidential election Paul Williams, along with Joe Louis (the former world heavy weight boxing champion), officially endorsed the Nixon-Lodge presidential ticket in the LA Times, November 3, 1960.

Louis believed Richard Nixon wasthe “best trained” candidate in the race. In this photograph Louis was in the ring with Max Schmeling in 1936.

Homes at Peninsula Built For Best View

Los Angeles Times, October 9, 1960

“Homes in Seaview Palos Verdes, on the southern heights of the peninsula, are positioned individually on terraced lots by Paul R. Williams, FAIA, for maximum view. Some are angled so that the rear expanses of glass will face the most interesting view possible.”

Veterans Buy Most of Homes

Los Angeles Times, March 20, 1960

“Veterans of World War II comprise 95% of the early purchasers of Seaview Palos Verdes Homes, a sales office check has revealed. … Forty-one exterior designs based on nine floor plans have been created by Paul R. Williams, FAIA.

17 Negro Leaders Invited to Ghana Embassy

Jet, April 7, 1960

“In the first such project arranged since the African Freedom Drive, Ghana Ambassador William M.Q. Halm will play host to outstanding U.S. Negro businessmen at the Embassy dinner in Washington. Among those invited…architect Paul Williams.”

Chemosphere, Los Angeles, California

Architect John Lautner’s designs reflected his philosophy of shelter as a basic human need. His works were a meditation on the relationship of people to space and space to nature. An apprentice in the first class at Taliesin (Frank Lloyd Wright’s school), Lautner began his own practice in Los Angeles in 1939. He was credited with Googie-style architecture in the 1950s.

Lautner designed the eight-sided Chemosphere for engineer Leonard Malin on a seemingly impossible location with a 45-degree slope in the Hollywood Hills. Cantilevered from a 30-feet-high, poured concrete pedestal, the home was known locally as the “house on a post.” Part Jetson cartoon, part James Bond party house and totally iconic midcentury modern, the 1960 house was constructed of steel, wood and concrete. A new chemical adhesive-sealant solved the construction problem of bonding the concrete and steel. Owner Malin collaborated with the architect to design a four-seat cable car for access from the road. (Popular Mechanics, October 1961)

Photographed by Julius Shulman, the Chemisphere was featured in a number of motion pictures including Body Double.

1961

Serves with future president

Williams Given Honors at Testimonial

Building Your Airport From the Ground Up

Carver Dedicates Building Thursday

1962

1963

1964

1965

1966

1967

1968

1969

St. Jude Research Hospital Dedication

If I Were Young Today

Lighting is Installed for Angel Shrine

Art and Architecture Building, Yale University, New Haven, Connecticut

Salk Institute, La Jolla, California

Successful American Negroes

“A Man With $100,000 Ideas”

Civil Rights Act Signed

Festival at Rockford College features Williams’ renderings

Why The Rioting?

Riots in Watts

Voting Rights Act of 1965

Concrete Design—Fedco Department Store

Strictly Collegiate

Shank House, Altoona, Pennsylvania

Williams Called a “Dean of Architects”

Jay Paley House Rediscovered by Architectural Digest

Dr. King’s Death Shocks County’s Negro Community

Assassination of Civil Rights Leader, Dr. Martin Luther King, Jr.

Ford Foundation, New York City

Williams’ Contributions to Los Angeles Architectural History Appreciated

Astronauts Honored at West Coast State Dinner

Royal Inn To Be Built in Victorville

Walter A. Gropius Dies

Mies van der Rohe, Important Modern Architect Dies

Money Men Don’t Call Press To Tell of Giving

National Center for Atmospheric Research, Mesa Lab, Boulder, Colorado

Martin Luther King Jr is TIME’s “Man of the Year”

Touring the Town

A ‘Farewell’ Party at the Errett Cord Mansion

Air Force Academy Chapel, Colorado Springs, Colorado

Listed among 100 richest African Americans

National accolade for use of steel

Decade at a Glance

The 1970 Census counted 204,879,000 people living in the U.S. The average life expectancy for all women at 74.8 years, which exceeded men by 7 years.

American workers’ average yearly salary was $7,564. Milk costed 33¢ a quart and steak $1.30 a pound.

The country’s national debt was $382 billion.

The 1970s were the “Me Decade,” individuals looked within themselves for meaning and personal satisfaction.

Andy Warhol, David Hockney, Judy Chicago and performance artists challenged the public’s understanding of art.

The National Guard killed four students at Kent State University during an anti-war protest—a devastating event for Americans. Public opinion shifted regarding the war in Viet Nam.

Sixties inspired fashion goes mainstream. The movie Annie Hall (1977)  influenced women’s apparel. Mood rings, pet rocks, smiley-face stickers and nude streaking were popular fads.

Affirmative Action was public policy and changes education, employment and housing.

Television came of age tackling subjects once considered taboo with All in the Family, Three’s Company and Maud.

Athletes are no longer owned by teams but can be “free agents.” Quarterback Joe Namath posed in an advertisement wearing women’s pantyhose.

Frank O. Gehry Residence in Santa Monica, California

“Most people feel comfortable living in a little brick house, or a wood clapboard house, or some other known type. I am not immune to that. I like it myself. But I also think that one has to explore living in the present … it is important to communicate new ideas and discoveries.”  (Frank O. Gehry. Bulletin of the American Academy of Arts and Sciences, 1996)

Frank Gehry was an important American architect of the late 20th and early 21st centuries. With public and private projects around the world his designs influenced other architects, and challenged the traditional design maxim–form follows function. Gehry believed that “architecture is so cluttered with problems of function…that architects hide behind a lot of those things and develop rationales based upon functional issues such as keeping the water out and the sun in or out.” (Gehry. Design Quarterly, 1987)

One of Gehry’s earliest projects (1978) was the re-envisioning of his own home in Santa Monica, California. (Image) Beginning with a traditional two-story clapboard bungalow, his design is a mix of materials that surround the original structure in glass, plywood, chain-link fence, asphalt, aluminum metal siding, and plywood. Gehry completed the deconstruction of his home by gutting the interior down to the original 2×4 stud frame and rafters. A “collision of parts” the controversial on-going building project was applauded and panned by neighbors. Gehry considered his family’s home both a free-form sculpture and a collage…built to stay but “deliberately unfinished.”

The Gehry Residence was the winner of the AIA’s 2012 Twenty-Five Year Award for “a building that has stood the test of time for 25 to 35 years as an embodiment of architectural excellence.”

50 Years of Home Design

Nearing his retirement from active practice, Paul R. Williams’ abilities as a master of California elegance are recognized by influential Los Angeles interior designers—a 1934 estate from his “bygone days” is selected as the 1970 Design House West. The decorators refreshed the interior of the 30-room Barrick mansion on Ambazac Way and bring it back to “modern-day life.” Public tours of the house were a fundraiser for various cancer-related charities.

To publicize the event Los Angeles Times writer Maggie Savoy interviewed Williams. In the lengthy article the architect reminisced about his work with famous and powerful clients and the importance of their individual psychologies in personalizing the design. “People don’t always know what they want. It is the architect’s job to help them find it, and keep within the bounds of grace.” Williams’ tact, refined taste and ability to design a home, no matter the size, became his signature. Looking back on his professional career, Paul Williams’ interview with Savoy is an excellent summary of his aesthetic and work philosophy.

This photograph shows Williams’ design for one of his important 20th century celebrity clients—Frank Sinatra. This example of chic midcentury architecture was torn down.

Alumnae To Host Tour of Estate

Los Angeles Times, October 16, 1970

“Valley Alumnae Club of Pi Beta Phi will host a luncheon and tour of Design House West on Thursday at 10:30 a.m. Members will view the 42-year-old estate…which was designed by architect Paul Williams.” [image]

In 1973 Williams begins designing a sorority house on the USC campus for Pi Beta Phi. This is one of his last commissions before retiring from his practice.

First Commercial Microprocessor Is Announced

In November, 1971 the Intel Corporation announces the development of a single chip microprocessor—the Intel 4004 (U.S. Patent #3,821,715). The company’s engineers revolutionize computer design by placing all the parts that make a computer think on one small chip—the size of a cornflake. This chip is as powerful as the first computers that filled an entire room. Intelligence can now be programmed into inanimate objects. The Intel 4004 is an important first step in the development of the personal computer and software that shape and transform modern society.

Williams Name Adds Value

Los Angeles Times, March 21, 1971

“An estate property at 1001 N. Crescent Drive, Beverly Hills, has been sold for $400,000 by the Harleigh Sandler Co. Mr. and Mrs. J. Silverstein bought the Paul Williams designed home.”

In 1955 Williams designs a 5,300 sq ft home in Beverly Hills for John Landis, President of Mission Pak fruit shippers. In 1961 the residence and grounds are featured in House Beautiful illustrated with photographs by Maynard L. Parker. The house is resold in 1995 for $2,6000,000 and is advertised as a Williams’ design.

St. Jude Event Set To Salute Its Designer

The Commercial Appeal, March 19, 1972

“Paul R. Williams, architect and designer of St. Jude Children’s Research Hospital, will be honored at a dinner May 17 which will observe the hospital’s 10th anniversary…Edward F. Barry, chairman of the St. Jude board of governers, said in announcing the dinner, ‘It is a token of appreciation for the generosity of Mr. Williams, who did not charge a penny for all the work he and his firm did in designing the hospital.’”

This photograph taken in 1962 for the Memphis Press-Scimitar newspaper, is an aerial view of the completed hospital. Very little of the original building survives today.

St. Jude hospital architect to be honored

Tri-State Defender, April 1, 1972

“Williams said he regards St. Jude Children’s Research Hospital as the most ‘satisfying’ building he ever designed because of the work done in it…Williams’ roots grow from Memphis to his home in Los Angeles…His father was headwaiter at the Old Peabody Hotel until he moved his family to Southern California before the turn of the century. His mother was a native Memphian, too.”

This was how the Peabody Hotel (building on left) looked when Chester Williams worked there as a waiter from 1884-1893. It was located at Main and Monroe.

USC Honors Williams

As Paul R. Williams began to think about retiring from active practice he is honored by peers and others in the community. Tributes were announced at a testimonial dinner given for Williams. University of Southern California named a room in his honor in the soon-to-be-completed Watt Hall in the architectural complex. In addition the creation of the USC Paul Williams Scholarship in architecture is announced and Broadway Federal Savings and Loan Association donated the first check.

Colleagues Honor Paul R. Williams

Los Angeles Times, May 27, 1973

“Paul Williams, whom we honor here tonight, pioneered this profession as a minority architect and has, consequently, removed some of the barriers confronting us, thus, giving to us that incentive to press forward in a society with a slowly changing attitude, Harold Williams (no relation), president of the Association of Minority Architects and Planners of Southern California, told the audience of 450 at the Beverly Wilshire.”

In the 1940s and 1950s Williams was hired for the extensive renovations at the Beverly Wilshire. The hotel was added to the National Register of Historic Places in 1987. Williams’ additions/renovations were cited in the supporting document as significant examples of 1940s to 1950s period architecture.

Oil Crisis

The Organization of Arab Petroleum Exporting Countries (OAPEC) initiated an Oil Embargo against the United States in response to America’s support of Israel during the 1973 Arab-Israeli War. As U.S. petroleum production fell, the country grew dependent on imported foreign oil. The crisis had decades long affects on American society:

  • Stagflation, stagnet growth combined with inflation, gripped the country and Americans became less optimistic about the future;
  • The romance of owning a large automobile waned;
  • The government mandated fuel efficiences and the age of energy conservation began—conserving gasoline became a national obsession;
  • Americans considered other forms of transit to commute from home to work;
  • Suburban homeownership looks less inviting as the cost of gasoline rises.

In 1959 Paul R. Williams predicted that “people will start coming back to the city to live and will want a home designed around business and social activities.” He could not foretell the energy issues of the 1970s when he made this prediction, but his understanding of consumer behavior and psychology informed his vision of the future.

Survey of Black Architects and Craftsmen published

First titled Negro Digest (1942), Black World (1961-1975) is originally a compilation of previously printed articles of interest to African America readers. Published by John H. Johnson, the magazine is similar in format to Reader’s Digest. During the 1960s the magazine is often controversial and evolves into a forum for African American thought on culture and the role of Black Power. In a 1970 editorial, the publisher writes that the magazine will “routinely publish articles which will probe and report the conditions of peoples and their struggles throughout the Black World.”

In 1974 Black World published an original article by architect and historian Richard K. Dozier surveying the history and ongoing importance of Black architects and craftsmen to the minority community and their influence on the greater American building tradition. Dozier notes the work of slave craftsmen and the founding of Tuskegee Institute in 1881 as important milestones. Though Paul Williams had recently retired from active practice, contemporary photographs of his projects illustrate the survey.

The Family Keeps Changing, But The Design Remains

Los Angeles Herald Examiner (California Living), April 11, 1976

“One of the last projects which architect Paul Williams F.A.I.A gave personal attention before his retirement—an elegant colonial house on USC’s sorority row— was also a first for the famed Los Angeles architect. He had never designed a sorority house. He said he wanted to ‘design the most beautiful sorority house in America.’ “

The sorority house is seen in this contemporary photograph.

Operation Sail: Ships From 20 Nations to Join in Bicentennial Event

Gadsden Times, December 13, 1975

” ‘I don’t think you’ll see anything of this magnitude again,’ said Harry Lynch, who heads the Boston end of the operation. ‘It will be the greatest armada of sailing ships ever seen in this hemisphere. There is no doubt about it being the biggest spectacle of 1976.’”

American Revolution Bicentennial

The United States commemorated the 200th anniversary of the signing of the Declaration of Independence with a year-long celebration. All 50 states developed a variety of activities to commemorate the Declaration but the Freedom Train and Operation Sail are national in scope. The Freedom Train toured the 48 contiguous states and contained historic artifacts rarely seen outside of museums. During Operation Sail, 16 antique, square rigged sailing ships from around the world, along with hundreds of smaller vessels converged on New York Harbor on July 4. Six days later the flotilla entered Boston Harbor led by the USS Constitution, under tow. The entry of the tall ships into New York Harbor were broadcasted around the world by the major television networks.

Hundreds of “sanctioned” and unofficial patriotic festivals and observances took place across the United States during the celebration year. The Bicentennial was a respite from the national trauma of the 1970s.

Maynard L Parker, architectural photographer, dies

Maynard L. Parker’s photographs are a visual record of 20th century California life-style. In the 1920s Parker worked for Mott Studios, the company that sets the standards for modern architectural photography. Using floodlights and stage-like settings for each room, his pictures of the homes and haunts of movie stars and the affluent helped craft their glamorous images for the curious public. An example of this technique is seen in this Mott photograph of the Jay Paley residence.

In the 1930s Parker worked as an independent photographer and his many commissions chronicled the design work of important California architects including Paul R. Williams and Cliff May. His images of a May design on the cover of Sunset (1946) helped usher in the age of the California ranch house—a style that swept the country.

Parker worked with editors of every major design magazine in America but his relationship with Elizabeth Gordon, the powerful editor of  House Beautiful (1941) was important for his career. His photographs of the homes of the powerful and famous were important elements Gordon used to promote her aesthetic message. The Parker images illustrated her advocacy of the American life-style, American design, and the education of an emerging middle class American consumer. His association with Gordon and House Beautiful continued through the 1960s.

Maynard Parker photographs scored of Williams’ homes and hundreds of these photos were recycled in design and building trades magazines or as illustrations in decorating books. His images of the Jay Paley residence were widely published and were important in crafting the mystique of both the house and its swimming pool. (The Zodiac Pool is often listed as one of the most beautiful ever built in the U.S.) Parker’s use of dramatic lighting, curated room settings and wide-angle lens created the chic understated “look” often associated with Paul R. Williams.

Maynard L. Parker died in 1976 and his work was quickly forgotten. Parker’s reputation was revived and his artistry rediscovered in 2012 with the cataloging and digitizing of his photographs housed at the Huntington Library and the publication of Jennifer A. Watts’ book—Maynard L. Parker: Modern Photography and the American Dream. Thousands of Mott Studio photographs, including Parker’s, are now digitized and available through the California State Library’s web site. Many of his photographs of Paul R. Williams’ designs are included in the collections at both libraries.

Philip Johnson “The Philosopher Architect” Profiled

“Anybody who makes a progostication’s a damned fool. I’ve done it and I know it’s always, always wrong…The greatest challenge in the next century in architecture? Just the continual anguish and reform and replanning and nobody, nobody knows what strange changes are going to take… And now the kids! We have a wonderful generation coming, twisting it all out of what an older person would think was shape. But they’re doing it with such panache, with such verve, with such delightful humor, that a whole new panoply of architecture’s opened up.”

The Difference between Shelter and Sanctuary

A. Quincy Jones had a thriving practice that changed the face of suburban Southern California and reflects the values of an emerging American middle class homebuyer. He also taught and became the Dean of the University of Southern California’s School of Architecture (1951-1967). His philosophy of valuing “meaningful living” over “mundane existence” influenced hundreds of new architects. He advised his students to design not only a living space but also “a sense of community.”

During the last decade of his life, Jones was interviewed extensively about his belief that residential design is about people. He encouraged young architects to view their practices as “Designing for the Homes of Tomorrow.” He advised them to “have the strength” to turn down developers who proposed projects they do not believe in because one can “make more money by providing the best possible living experience for the people who buy his houses” instead of creating sterile, one-size-fits-all subdivisions.

Many of his ideas echoed those Paul R. Williams proposed decades earlier in his books—The Small House of Tomorrow (1945) and New Homes For Today (1946). Both Williams and Jones were considered “champions” and advocates for small, affordable California housing.

Architect A. Quincy Jones dies

After receiving his Bachelor of Architecture from the University of Washington, A. Quincy Jones works for Paul R. Williams from 1939 to 1940. In 1945 Jones opens his own architectural practice but continues to collaborate with Williams for decades on more than 20 projects including the Palm Springs Tennis Club (1947), Town and Country restaurant (1948), proposed Coconut Island Club International (1946) and Pueblo Gardens, a large Del Webb housing project built in Arizona during the 1940s and 1950s. Both men believe in the importance of small home ownership for American society.

Williams and Jones bring unique skills and strengths to their relationship. John Crosse, a Southern California architectural historian, notes that reading personal correspondence between the two men indicates they “obviously had a mutual respect for each other.” At the start of his practice Jones asks his mentor for advise on a variety of residential projects. Crosse states, “The association between Williams and Jones worked pretty much like this: Williams got the clients and Jones did the design and construction oversight, a win-win for the duo.” (SOCALARCHHISTORY 12/13/2009)

1972

1970s

1971

1973

1974

1976

1980s

Paul Revere Williams dies January 1980

In January Paul Revere Williams died in a Los Angeles Hospital at the age of 85. He was survived by his wife Della, his daughters and grandchildren.

Though he retired in 1973 from the day-to-day activities of architecture, his firm continued for a number of years. (Jet. February 14, 1980)

Tributes to Williams in the news

Los Angeles Sentinal, January 31, 1980

“The cover of the all white program carried the initials PRW impressively embossed in gold. Nothing else. Paul R. Williams…was a very private person. He was eulogized at his beloved First A.M.E Church in quiet dignity. Everything was planned to perfection, just as he would have had it.”

Los Angeles Times, January 28, 1980

“When he died Wednesday at age 85 Williams left behind thousands of silent monuments to his artistic skills.”

Chicago Tribune, January 30, 1980

“The glorious life of one of my childhood heroes ended last week. But I felt no tendency to mourn his passing. I weep only for those—particularly the young—who never knew about the achievements of this man.”  Vernon Jarrett, writer for the Tribune.

1990s

Williams’ professional records lost

Williams’ business records (letters, drawings, photographs) are stored at the headquarters of Broadway Federal Savings in Watts. Williams renovated and repurposed this former Woolworth’s building in 1954 for the bank. During “the turmoil and civil unrest that rocked Los Angeles” in the aftermath of the jury’s verdict in the Rodney King case, the building and all contents were burned.

Scroll to Top