Paul Revere Williams 

Through Time

The Timeline illustrates how material history, society and the work of one person, Paul R. Williams, integrate and interact. Small changes in society, architecture or life may seem inconsequential, but when connected a powerful picture emerges. The Timeline illustrates how many forces shape our modern life. Williams’ life did not form in isolation but was a product of complex energies in society, his profession and within himself.

 

 

Timeline

Choose a Time Period

1870

First Skyscraper

When was the skyscraper built, and what building can rightfully be called the first skyscraper?

Awarding the title of the first skyscraper is debated among architectural historians, architects, and engineers. Just having height is not enough for the building to be called a skyscraper. It is equally important to make a building livable and useable (these were developed in the late 18th and early 19th centuries). All elements were brought together in one building in 1870.

Engineer George B. Post completes the Equitable Life Assurance Building in New York and is credited with designing the first example of a skyscraper in the United States. Using a skeletal iron frame as the structural system, the building reaches a height of 7-1/2 stories. In addition to the building’s height, the other elements of the designer The post includes elevators to move visitors up and down, plumbing, heating, and electrical that service the top floors. With these services, tall buildings are habitable, and owners can charge premium rents. (image L)

The building was destroyed in 1912 by a fire (image R).

A Decade at a Glance

The U.S. population was 39,818,449.

The nation celebrated the centennial in 1876 by opening an International Exhibition in Philadelphia with exhibits of the latest American technology. (image)

Thomas Edison invented the phonograph and the light bulb. Alexander Graham Bell patented the telephone. Barbed wire is invented. This wire was the first economical way to fence-in cattle in the western U.S. Charles Elmer Hires introduces the first commercial root beer.

The 15th Amendment to the U.S. Constitution—guaranteeing the right to vote regardless “of race, color, or previous condition of servitude”—is adopted. California votes against ratification.

The Great Chicago Fire claimed 250 lives, destroyed 17,500 buildings, and caused an economic panic that moved across the country.

Charley Brewster Ross, 4 years old, is the country’s first kidnapping for ransom. He is never found.

1871

Great Chicago Fire

On the evening of October 8 in 1871, Chicago was engulfed by fire. The windy and dry conditions blow sparks over the city of predominately wooden buildings and wood covered streets. With inadequate equipment and not enough men, fire fighters were not able to contain the fire. The conflagration burned for three days killing hundreds and destroying approximately 4 square miles of the city. Property loss is estimated at over $250 million and 90,000 people are homeless. The Great Chicago Fire is one of the largest U.S. disasters of the 19th century.

Architecture after the great chicago fire

Louis Sullivan and his partner Dankmar Adler were instrumental in rebuilding Chicago after the Great Fire in 1871. Adler is a civil engineer known for his expertise in acoustics especially for theaters and houses of worship. Sullivan’s architectural designed foreshadow the Modern Movement in architecture. Though he coined the phrase “form ever follows function,” a phrase the Modernist embrace as buildings without decoration, his use of decorative elements puts him outside of the Modernist Movement.

Before partnering with Adler, Sullivan worked for William LeBaron Jenney, a pioneer in skeleton construction. Though the firm of Adler and Sullivan is considered a leader in the “Chicago School of Architecture”. They designed buildings in many other American cities including the Wainwright Building in St. Louis. Sullivan’s work and ideas influence Frank Lloyd Wright.

The rebuilding of Chicago after the Great Fire was one of Adler and Sullivan’s greatest accomplishments. The devastation caused by the fire provided them with a blank canvas to experiment with new building technologies and nonflammable materials. The Chicago Tribune wrote of the task of rebuilding the city, “In the midst of a calamity without parallel in the world’s history, looking upon the ashes of thirty years’ accomplishmnets, the people of this once beautiful city have resolved that CHICAGO SHALL RISE AGAIN!.”

1875

William Watts Sherman House, Rhode Island

Trinity Episcopal Church, Boston

Trinity Episcopal Church in Boston, Massachusetts, was an example of Romanesque architecture in the United States according to the Historic American Building Survey. Designed by architect Henry Hobson Richardson, the church was considered his greatest work in this style.

Edison Invents the Light Bulb

In 1875, Thomas A. Edison established an experimental laboratory in Menlo Park, New Jersey. He envisioned the laboratory as a facility dedicated to pure invention. Menlo Park was one of the first modern industrial research labs. An early interest was the incandescent light bulb.

Edison envisioned economical/practical electrical lighting to improve the everyday lives of Americans. He believed the key is an efficient incandescent lamp. Incandescent lamps make light by heating a filament (thin strip of material) until it glows. From 1878 to 1880, Edison and his team conducted 3000 experiments to learn how to make this lamp. In 1879, Edison succeeded by inventing his first high-resistance, incandescent electric light. Made of a thin platinum filament, mounted in a glass vacuum, the bulb produces light, but only for a short time. Edison continued to experiment with thousands of different substances until he found a suitable, durable material to use for the filament. Patent number 223,898 is given to his successful electric lamp.

By the 1930s, the U.S. government purchases an average of 4,000,000 light bulbs a year for use in government buildings. In this photograph, the National Bureau of Standards does a variety of quality tests to determine the amount of light lamps provide and how long they last.

Leiter I Building, Chicago

According to Historic American Building Survey, the first Leiter Building, built in 1879, is a Chicago Architectural Landmark. William LeBaron Jenney is the architect. The building is a landmark because it contributed to the development of skeleton construction. Constructed of cast iron pilasters from the foundation to the roof, the building could be built taller. Jenney’s skeleton construction, replacing stone and brick, is an important engineering advance that leads to skyscrapers.

1880

Decade at a Glance

The 1880 Census counted 50,155,783 people living in the country.

More Americans left their farm and work in factories. Over 300,000 workers demonstrated for an 8-hour work day. The American Federation of Labor, an organization of skilled workers, was founded.

The first building with a steel skeleton was constructed in Chicago and the Age of the Skyscraper began.

Booker T. Washington opened the Tuskegee Institute in Alabama.

Railroads in the United States and Canada adopted a standard time.

The Johnstown Flood in Pennsylvania killed 2,295 people.

Edison power plant opens

On September 4, 1882, Thomas Edison’s (L) power plant in New York City generated and distributed electric power to 59 customers. It is viewed as a high tech wonder. The power plant and its transmission lines were financed by banker John Pierpont Morgan. (Morgan’s New York residence was the first private home in America to be illuminated by electricity.) By funding Edison’s power plant, this financier was instrumental in opening a new technological era in America.

Paul R. Williams wrote about important developments in electric lighting in his 1945 book, The Small Home of Tomorrow. “New methods of indirect lighting built into the design of the room with tiny concealed adjustable spot lights for reading areas will be one of the post war developments.”

1882

1883

Brooklyn Bridge

1884

1886

Statue of Liberty

Cotton Consumed

William G. Low House, Rhode Island

The Old Missions

The Times (Los Angeles), January 26, 1889

“Kate Field has written a pleasant letter…in which she discourses of the winter resorts of California, and also refers to those old monuments of a past civilization still remaining in our midst. She says: ‘There appeared in the New York Critic a communication to the effect that the much vaunted missions of California were architecturally beneath contempt, and that Helen Hunt Jackson was indebted to her fancy for her praise of these ruins….If there be churches elsewhere as picturesque as the restored mission at Santa Barbara or the (alas!) unrestored San Luis Rey… I know not there existence.’ “

Casa de Rancho Camulos, pictured here, is an example of a California mission immortalized in Helen Hunt Jackson’s novel Ramona.

1887

1889

Leiter II Building, Chicago

In 1889, William LeBaron Jenney constructed the second Leiter Building in Chicago, one of the largest commercial structures in the world. This building refined skeletal construction. The Historic American Building Survey described the design of this building as clear, confident and distinctive.

1890

1893

1892

1891

Decade at a Glance

The U.S. population expanded to 62,947,714.

The financial panic of 1893 caused the worst economic depression in American history at that time. Jacob Coxey led his army of 6000 unemployed men on a march on Washington, D.C. Williams Jennings Bryan electrified the Democratic Presidential Convention with his “Cross of Gold” speech and won the nomination.

The boll weevil arrived in the Texas cotton fields.

The battleship Main blew up and sank in Cuba triggering the Spanish-American War.

Biddy Mason Dies

At the time of her death, Biddy Mason, a former slave born in 1818, was one of the largest real estate holders in Los Angeles. She helped found the First AME Church in the city and contributed to many charitable causes.

In 1964, Williams, a member of the First AME Church, contributed plans for the new building pictured.

Wainwright Building, St. Louis

The U-shaped Wainwright Building, a ten-story office building in downtown St. Louis, was constructed using a steel skeleton. The exterior was finished with elaborate red brick and terracotta. This embellished exterior was similar to Paul R. Williams’ treatment of the Edwin Building in 1928. The Wainwright Building was designed by the Chicago firm Sullivan and Adler.

Monadnock Block

Monadnock Block in Chicago was one of the tallest and last buildings constructed of solid masonry. This wall-bearing building with cast iron columns did not use steel framing, which would become a standard for tall building construction.

Ida B Wells

Ida B. Wells, editor of the Memphis African American newspaper Free Speech and Headlight, used journalism as a weapon against lynching and racial bigotry. In her 1892, pamphlet Southern Horrors: Lynch Law in All Its Phases she wrote, “Nothing is more definitely settled than he must act for himself … The gods help those who help themselves.”

Frisco Bridge across Mississippi River at Memphis

On May 12, 1892, the Frisco Bridge in Memphis, Tennessee opened one year before Chester and Lila Williams moved to Los Angeles. It was the first bridge to span the lower Mississippi River and the crowning achievement for chief engineer George S. Morison. Hundreds attended the opening ceremonies to watch the first locomotive cross the bridge. The railroad bridge linked commerce from eastern markets to the west.

When constructed, steel was a new material for large projects. The cantilevered bridge featured a 790-foot span with two smaller 600-foot spans. At 65 feet above the river, the Frisco Bridge had the highest clearance of any bridge in the United States. The piers were 100 feet below the surface of the river.

US Post Office, Washington, D.C.

The U. S. Post Office Building was constructed in Washington, D.C. from 1892 through 1899 under the supervision of architect Willoughby J. Edbrooke. The building was the first of ten planned governmental buildings built in the Federal Triangle formed by 15th Street NW, Constitution Avenue NW, Pennsylvania Avenue NW, and E Street NW. Many of these buildings were architecturally important and the Post Office building was one of the few examples of Richardson Romanesque in the U.S. Capital and the only govenment building in this style.

Built of Maine granite, the building’s most prominante architectural feature was a chateau roof with a 315 foot high clock tower centered in the main facade. The building’s turretted corners, fenestration treatment and ornamnetal dormers were typical of the Romanesque style. The nine story open central court was covered by ornamental iron trusses and housed a bank of open cage elevators. The large glass skylight floods the interior with light.

Paul R. Williams’ parents, Chester and Lila, moved to Los Angeles with Paul’s older brother, Chester Stanley Williams, Jr. His parents opened a fruit stand on Olvera Street. (LA Times, February 28, 1993) Olvera Street was one of the oldest sections of downtown Los Angeles.

Coming to California

Los Angeles Times, June 5, 1893
John S. Lovell arranged to bring African Americans to California from the South in the belief that “there are too many colored people in the South and they need to go to newer States and Territories to get homes.”

Plentiful and inexpensive land provided opportunities for African American emigrants moving to Los Angeles.

Hale Woodruff and Charles Alston painted murals illustrating African American contributions to California history. The 1949 murals depicted these early California emigrants in Paul R. Williams’ designed Golden State Mutual Life Insurance Building.

Bradbury Building, Los Angeles

George Herbert Wyman designed the five story Bradbury Building in Los Angeles for mining tycoon Lewis Bradbury. The structure was designed with a glass roof that fills the inner court with natural light. The open stairways, elevator cages and ornate balcony rails were all decorated with fantastic art nouveau iron work. The decorative details were reminicent of the 19th century European Cast Iron Age. Wyman’s design for an off-street and protected public space at the center of the building was ahead of the time. Wyman designs other buildings, but the Bradbury was his greatest success.

1900s

`The American Negro At Paris As Reported by W.E. Du Bois

The American Monthly Review of Reviews, Vol. XXII, 1900
“On the banks of the Seine … stands a large, plain white building, where the promoters of the Paris Exposition have housed the world’s ideas of sociology. As a matter of fact, any one … would be rather disappointed at the exhibit … The United States section of this building is small, and not, at first glance particularly striking … In the right-hand corner, however is an exhibit which, more than others in the building is sociological in the larger sense of the term … This is the exhibit of American Negroes, planned and executed by Negroes … We have thus … an honest, straightforward exhibit of a small nation of people, picturing their life and development without apology or gloss, and above all made by themselves.” The American Monthly Review of Reviews, Vol. XXII, 1900
“On the banks of the Seine … stands a large, plain white building, where the promoters of the Paris Exposition have housed the world’s ideas of sociology. As a matter of fact, any one … would be rather disappointed at the exhibit … The United States section of this building is small, and not, at first glance particularly striking … In the right-hand corner, however is an exhibit which, more than others in the building is sociological in the larger sense of the term … This is the exhibit of American Negroes, planned and executed by Negroes … We have thus … an honest, straightforward exhibit of a small nation of people, picturing their life and development without apology or gloss, and above all made by themselves.”

When he is 6-years-old, Williams attended Sentous Avenue Grammer School on Pico Boulevard. He wrote about this school later in his life and said that he is the only African American student in his class.

In the 1900, U.S. Census Los Angeles is ranked 36th in the nation based on population. Slightly more than 102,000 residents lived in Los Angeles and of that number only 3,131 were Negroes.

As a comparison, Neyland Stadium at the University of Tennessee, Knoxville, seats 102,000.

Troy Orphan Asylum, chapel, Troy NY

Herbert Langford Warren, an MIT educated architect, designed the Troy Orphan Asylum chapel in Troy, NY—an example of Gothic revival-style architecture.

As a young man, Warren travelled in Europe and England studying, sketching and measuring country churches. Many of these churches were destroyed during World War I. Warren wanted to recreate this style of church in America. Warren was described by his contemporaries as a “Goth at heart” eventhough he worked in H. H. Richardson’s office, an architectural firm known for Romanesque style. (Proceedings of the American Academy of Arts and Science, 1933)

Warren helped develop the Architectural School at Harvard.

Decade at a Glance

Only 76,000,000 Americans live in 46 states. The average life expectancy for white men and women was 47. African Americans lived an average of 33 years.

The horse and buggy was slowly replaced by the automobile. Nationally there were 8000 automobiles traveling on 10 miles of paved roads. Ninety-six people died in car-related accidents. Fifteen states imposed speed limits of 20 miles per hour.

In 1904, there were only three automobiles in Hollywood, California and most residents still travel via real horse power. With an improved paved infrastructure and a new rail system, horses were replaced in Hollywood by cars and a Trackless Trolley. (Dangcil. Hollywood 1900-1950, 2000)

American workers made $12.98 per week for 59-hours work

1901

Washington Invited to White House for dinner with President

Los Angeles Times October 21, 1901, “Southerners Are Not All Superheated”
Booker Washington Incident Greatly Magnified. President Did Not Invite Him in Order to Establish Rare Equality–Many White People in the South Congratulate Him.

Los Angeles Times October 28, 1901, “The Memphian ‘Storm Center’”
According to the Memphis Commercial Appeal, that city was “the storm of indignation” on account of the acceptance by Booker T. Washington of an inviation to dine with the President.

Washington’s Up from Slavery was published and he was invited to the White House for dinner by President Theodore Roosevelt resulting in both positive and negative news reports across the country.

Washington, a founder of the Tuskegee Institute in Georgia, was considered the most important African American educator of the 19th century. Paul R. Williams acknowledged the importance of this African American hero by including a bust of Booker T. Washington on the facade of his 28th Street YMCA designed in 1926.

1902

Novel Plans For Building. Modern Acropolis for Los Angeles?

Los Angeles Times, July 13, 1902

“Plans have been prepared for the erection of an apartment building in Los Angeles upon a scale so much larger than any yet attempted to be almost monumental…The proposition is to build an eight-story, steel frame, concrete and glass fire proof structure with a basement and glass canopied roof…Those desiring to secure apartments must first be admitted into membership in a club… to be named ‘The Twentieth Century Club.’ Requirements for membership will be that the person is of good moral character, subject to no contagious or infectious diseases, not of negro or Chinese blood or descent… in case the person shall have children, he may deposit not less than $10 with the superintendent, which money may be available to make any repairs necessitated by the occupancy of apartment by children. The architects are Associated Architects and Engineers.”

Flatiron or Fuller Building in New York

The Fuller Building at 175 Fifth Avenue in New York was completed in 1902. The Chicago architectural firm of Daniel H. Burnham & Company designed the 22-floor building as a speculative project. Burnham used a steel frame, covered in a non-load-bearing limestone and terra cotta facade with a mixture of French and Italian Renaissance ornamentation. The building of copper-clad windows and pale-colored bricks was topped by a series of arches and columns with a heavy projected cornice and flat balustraded roof. The unusual design created the illusion of a freestanding colossal column. The design and extensive used of steel in the construction causes a general “buzz” in New York.

Though officially called the Fuller Building, the building is renamed the Flatiron by the public because of its unusual shape. Burnham’s triangular shaped building was his solution to an awkward building site.

1904

Negroes Sue For Lost Rights

Los Angeles Times, January 7, 1904

“Judge Richmond Waddill of the United States Circuit Court has transferred from this city from Norfolk three suits at common law entered by colored residents of this State who ask damages of $5,000 each from the Governor, members of the recent constitutional convention and election officers for the alleged deprivation of rights under the new constitution.”

Richard Waddill was one of the men seen in this group photograph of the United State Circuit Court Judges from the 1900s. The Library of Congress was an excellent source for images of America’s history.

Howard B. Gates House, San Jose

The Gates House in San Jose, California was designed by architect Bernard Maybeck for physicians Howard and Amelia Gates in 1904. The chalet form of the house with historical details was inspired by the large stand of trees on the site. Though Maybeck’s 3-story design was larger than other residences in the area, he crafted the exterior of the home to appear smaller and fit with the character of the upper middle-class neighborhood. The architect’s open living design for the interior included an oversized fireplace and dramatic staircase—radical for turn-of-the-century San Jose, but popular in many mid-century California homes.

Bernard Maybeck was an Ecole des Beaux-Arts trained architect who became the first professor of architecture at the University of California at Berkeley (1898-1903). He opened an office in San Francisco specializing in homes and large public buildings incorporating innovative building materials such as native woods, over-sized windows and handcrafted details in an eclectic and personal style.

1905

Discrediting the Auto

Los Angeles Times, February 2, 1905

“The automobile is a useful vehicle and its usefulness will probably grow as time passes…The automobile is still in an infantile stage of development. Clumsy, crude and costly as they are…there is an extensive field for self-propelling vehicles…”

At the turn of the 20th century the automobile was used primarily for recreation by wealthy Americans. The fuel or gasoline was sold to car owners at drugstores. In 1905, the first business (or filling station) dedicated to dispensing gas or oil directly to the motorist opened at 412 S. Theresa Avenue in St. Louis, Missouri.

Automobile ownership increased after Henry Ford mass produced an affordable vehicle for the American middle class. With middle class ownership, the demand for filling stations increased and more Americans could “motor” anywhere there are roads.

Access to gas stations allowed the average person to build his home anywhere the car can take him. In The Small Home of Tomorrow (1945), Paul R. Williams wrote about the importance of the car to Americans … including designated space for the car in their homes. “In a house of more extreme modern lines the carporte, or automobile shelter, has been made a feature of the exterior design.”

1906

Angel City Second in Number of Buildings

Los Angeles Examiner, March 11, 1906

“It certainly is a remarkable fact that the average building in Los Angeles costs $1,000 less than in the city having the next lowest average (Brooklyn). This is not because there is a lack of fine buildings in this city, but it is due solely to the fact that this is a city in which each family has its own cottage out in the open. A building in most other cities means a tenement in which many families are herded together, but in Los Angeles it means the addition of another home for a single family on a 50 foot lot, with plenty of sunshine and fresh air.”

In 1906, the Los Angeles city “boosters” tout the advantages of Southern California living in this newspaper article. This photograph from the Library of Congress showed an example of a Brooklyn tenement the article describes.

Unity Church, Oak Park

The Unity Church was built for the Unitarian-Universalist congregation in Oak Park, Illinois. Designed by architect Frank Lloyd Wright in the temple form, his intent is to created a space primarily for the worship and service of God but with the flexiblity to serve man.

This church, Wright’s earliest experiment in the use of reinforced concrete and steel, was considered the first large scale example using these materials in the United States. Because of the church’s limited financial resources, the architect pursuades his clients of the economy and appropriateness of the reinforced concrete and steel for their project. To counteract the material’s “dead surfaces” Wright washed the exterior exposing the pebble aggregate for a tactile affect and then painted the exterior. Wright continued to be interested in concrete as an economical building medium for residential and commercial buildings.

1908

Master Paul R. Williams graduates

The Freeman July 18, 1908 (Indianapolis, Indiana)

“Master Paul R. Williams, the adopted son of Mr. and Mrs. C. I. Clarkson, of Los Angeles, Cal., graduated with honor from the Sentons Street School of that city. He was the only colored pupil…”

Automobiles brought to the masses

The Ford Model T (Tin Lizzie) rolled off the assembly line in 1908. This affordable automobile opened travel to middle-class America.

The Gamble House, Pasadena

The Gamble House in Pasadena, California was the finest surviving example of the architectural work by Greene & Greene. The firm’s California Bungalow-style residence was a summer home for David Gamble (Proctor & Gamble soap company) completed in 1908 for $50,000. The three-story vacation retreat was pegged and doweled, wood framed construction covered with olive green cedar shingle siding. Typical of the bungalow-style, the interior was spacious and open with oak hardwood floors, teakwood and mahogany paneling, lath and plaster walls. A local newspaper described the home as “somewhat Japanese in feeling.” In addition to the house plans, Greene & Greene provided the owner with furniture; all decorative hardware and lighting fixtures; and textile selections for rugs, curtains, upholstery from their artisan shop. Many of the windows had custom Tiffany glass panels.

The Gamble House was the setting for Doc’s home in the 1985 movie Back to the Future.

The Greene brothers (Charles Sumner Greene and Henry Mather Greene) were the leaders in the American Arts and Crafts aesthetic movement and important in establishing Southern California as a center for this style. With an emphasis on craftsmanship instead of machined mass-production, their open, harmonious designs were a reaction to the clutter of the 19th century Victorian home. A perfect fit for the California climate, the Greene & Greene style was quickly adapted for other regions and spreads across America.

Sears Book of Modern Homes and Building Plans

The Sears Catalog was an icon of American business. Founded by Richard Warren Sears and Alvah Curtis Roebuck, this mail order business was a revolutionary retail model before the advent of the chain store. Through the catalog the company sold everything for home, farm and family to anyone with a mailbox.

In 1908, Sears issued the first speciality catalog for houses—Book of Modern Homes and Building Plans. The Modern Home catalog advertised three separate lines of homes featuring 22 architectural styles for customers with different financial means. The hundreds of choices and combinations encouraged the buyer to custom design his house. Mass-production and precut/prefitted materials shrank the construction time and costs making home ownership possible for more Americans. With prices from $650 to $2,500, Sears offered the home buyer a complete package: design plans, building materials, fixtures and “no-money-down” financing. By 1930, the catalog proclaimed Sears as the “World’s Largest Home Builders.” From 1908 until 1940, Sears sold over 100,000 ready-to-assemble houses.

Sears’ Modern Homes catalog became the model for merchandising prefabricated buildings. Paul R. Williams designed plans for the 1930s Lea Steel Home catalog that were used in the construction of El Reno Apartments. His catalog plans were also all inclusive.

Frederick C. Robie House, Chicago

The Robie House in Chicago was an early example of residential work by architect Frank Lloyd Wright. Wright’s design — later called the Prairie-style — was created for manufacturing executive Frederick C. Robie and his wife Lora in 1909. Wright was inspired by his client’s “unspoiled instincts and untainted ideals” and designed this house to serve Robie’s grand ideas for an expensive residence.

The design, tailored to fit the Robies’ narrow, corner lot (60 x 180), shocks neighbors. They compared the radical long and low red-orange brick building to a steamship—two rectangles (or vessels) abutting with the central chimney locking the pieces together. In this Prairie-style home, Wright organized the interior around a great limestone hearth under the wide sweeping roof. The open interior illustrated Wright’s  new philosophy of domestic design: he combines a feeling of shelter with an organic connection to the surroundings. Wright controlled every aspect of the home’s design infusing the final product with his new aesthetic ideas.

In the Robie House Frank Lloyd Wright used steel beams to stretch the walls twenty feet. The wood rafters rested directly on the steel. This use of steel in residential construction was a first.

Scroll to Top