Paul Revere Williams 

Through Time

The Timeline illustrates how material history, society and the work of one person, Paul R. Williams, integrate and interact. Small changes in society, architecture or life may seem inconsequential, but when connected a powerful picture emerges. The Timeline illustrates how many forces shape our modern life. Williams’ life did not form in isolation but was a product of complex energies in society, his profession and within himself.

 

 

Timeline

Choose a Time Period

1910

In June 1912 Paul R. Williams graduated with a class of 174 students from Polytechnic High School, Los Angeles. Polytechnic High School was described in a June 21 Los Angeles Times (1912) article as “the acme of present day high school educational results.”

For the next four years, he pursued a self-directed education, studying architecture and improving his skills. As a member of the Los Angeles Architectural Club, he participated in the training and competitions offered through the Society of Beaux-Arts Architects (1913-1916); he studied architecture at the University of Southern California (1916-1919); he worked as an apprentice in the offices of local architects and landscape designers.

Fine Send-Off to Fine Class

Los Angeles Times, June 21, 1912 Stirring Commencement of Polytechnic High. Graduates Impressive as the Diplomas Are Given.

“The high school career of 174 young men and women of the Polytechnic High School culminated at the Auditorium last night. The summer 1912 class represents the acme of present day high school educational results.”

Williams graduated with the class of 1912.

1911

1912

Decade at a Glance

1913

Triangle Shirtwaist Factory Fire

1914

La Jolla Woman’s Club

First Air Conditioning System in Private Home

How to Handle “Four Corners”

How to Handle “Four Corners”Registers for the Draft

Marries and Begins Work for Arthur Kelly

Enters 2nd White Pine Architectural Competition

Famous Tract to be Opened

Not Too Proud To Fight

War effort reduces building projects

White Pine Architectural Competition

Designs Winning First and Second Prizes in Los Angeles Pressed Brick Company’s Architectural Competition

Julia Morgan designs Hearst Castle (La Cuesta Encantada)

Quarantine Again On

1914

Williams was certified as a building contractor in 1915 and could build small projects. The California State Board of Architectural Examiners is the agency that maintains these records today, but the agency existed under a different name and mission in 1915. (Wesley Howard Henderson’s unpublished research)

William studied architectural engineering at the University of Southern California from 1916 through 1919. This photograph shows the campus at the time Williams attends classes at USC.

1915

Panama-California Exposition, San Diego

To celebrate the completion of the Panama Canal, San Diego staged an international exposition from 1915-1916. As the first American port-of-call north of the Canal and with a population of only 90,000, San Diego was the smallest city to host an event of this scale. With the ambitious theme of “human progress” the exposition showcased both the beauty of the city and the resources of the American West.

Architect Bertram Grosvenor Goodhue, in association with Carleton Winslow Sr., was chosen as the chief designer. He was fascinated by the festive Spanish Revival and Mission-style architecture of California and selected it as the unifying design for the exposition buildings. His use of Spanish inspired churrigueresque detail on the buildings created a sensation and inspires a regional and national popularity for Spanish and Mission Revival buildings—a craze that endured throughout the 1920s.

These images are not from the original exposition but record a remodel (1933-1935) of Winslow’s original designs by architect Richard S. Requa.

(Thanks to Will Chandler, project historian and art director, for his insights into the 1990 to 1996 reconstruction of the Exposition’s buildings.)

Hollyhock House, Hollywood

Oil heiress Aline Barnsdall commissioned Frank Lloyd Wright (L) to design a home and cultural center on an 11-acre olive grove she owned in Hollywood. Wright’s plans were complete in 1918 and included pools, educational buildings, shops, a theater, studios and residences for artists, and a sumptuous villa for Barnsdall. Only Hollyhock House (Barnsdall’s residence) and two studio-residences were built.

Hollyhock House was the first residence Wright desingned in the Los Angeles area. He considered the house as one of his major achievements—his California Romanza reflecting his pure love of architecture. Wright’s use of the Mayan temple proto-type illustrated the influence of a popular Pre-Columbian art installation at the 1893 Columbian Exposition. The building’s mesa silhouette recalled the architecture of the Pueblo Indians. The stylized motif of the hollyhock throughout the home represented Barnsdall’s favorite flower.

Wright described this project in his autobiography, “Individuality is the most precious thing in life… the true property of character. Hollyhock House is such a house.”

In 1926, the City of Los Angeles accepted the residence and surrounding acres as a center for recreation and culture. Paul R. Williams (R) is seen in this 1965 photograph with a model for a Junior Arts Center to be built in the park.

1916

1917

1918

1919

Men of the Month: A Young Architect

The Crisis, June 1917

“Wide-spread recognition of the ability of Mr. Williams as an architect has come early in his career … He was awarded first honorable mention in architecture at the Chicago Emancipation Celebration in 1915 … Mr. Williams is employed by one of the large architectural firms in Los Angeles. The designing of many of the fine home in Southern California can be attributed to his skill.”

Designs Commercial Building

In the March 30 issue of Los Angeles Builder and Contractor (later known as Southwest Builder and Contractor), Williams was listed as the designer for a two-story commercial building on South Los Angeles Street. Louis M. Blodgett, a successful African American millionaire, was the builder. Paul Williams later built both of Blodgett’s homes in 1922 and 1953.

Old Folks’ Home

Southwest Builder and Contractor, September 23, 1916

“Oliver O. Boyd has signed a contract at $4270 for erecting a 2-story frame building…for the Western Baptist Assn. of Southern California. The building is designed for occupancy as an old folks’ home and will contain sleeping rooms, dining room, kitchen, chapel, etc…Plans by Paul R. Williams, 1530 E. Twenty-first St.”

This was one of the earliest mentions of Paul R. Williams in Southwest Builder and Contractor. AIA Southern California Chapter selected this publication as its magazine of record in 1921.

Along the Color Line

The Crisis, March 1916

“The People’s Auditorium is to be erected in Los Angeles, Cal., at a cost of $35,000, by Negro citizens. Mr. Paul Williams, a young Negro architect, planned the structure.”

1920

At 25 years of age Williams lived at 784 E. 15th in Los Angeles with wife Della and Emily P. Clarkson who was listed as his god mother in the 1920 U.S. census. Williams described his occupation as “draftsman at an architect’s office.” He moved  to 1271 West 35th Street—a modest home in the black community of South Central Los Angeles where he lived for 30 years.

In 1920 he was appointed to the LA City Planning Commission by the 23rd Mayor of Los Angeles (Meredith P. Snyder) and served on the commission until 1928. The city was changing dramatically with the railroads connecting Los Angeles to the rest of the nation. Land was cheap and abundant. Unlike cities in the East that accommodated growth with taller buildings, Los Angeles could spread out. The LA leaders wanted to plan for the city’s future growth with a planning commission.

Carl Van Vechten records the faces of American art

Carl Van Vechten (1880-1964) is known today as “an artist of varied accomplishment” (Wall Street Journal, March 3-4, 2012) — music and modern dance critic for the New York Times, author of a controversial social novel and photographic portraitist. During his career as a photographer, Van Vechten captured the face of “every black author, performer

and socialite of note.” Fascinated by the Harlem Renaissance (African American cultural movement of the 1920s and 1930s), he promoted their work with his unique portraits.

Typically posing his subject in front of a distinctive exotic-print background, Carl Van Vechten produced thousands of images. His work was a who’s who of important 20th century African Americans. To be photographed by Van Vechten was to have arrived. His iconic images were used in popular books and textbooks.

Paul Revere Williams was photographed by Carl Van Vechten in the 1930s.

Art Deco District, Miami Beach

The Art Deco District in Miami Beach, Florida was the largest concentration of 1920s and 1930s resort architecture in the United States. Developers designed , built and promoted the area as the “tropical playground” for the nascent middleclass vacationer able to freely travel the country by automobile and train. The area, bounded by the Atlantic Ocean, 6th Street, Alton Road, Dade Boulevard and 23rd Street, was a mix of Mediterranean Revival, Art Deco, and International/Moderne-styles. The vibrantly colored and often architecturally fantastical buildings were divided into three use types: seasonal hotels, retail, and 80 square blocks of residential property. The district was recognized in 1979 as an important site of 20th century architecture, primarily Art Deco, by the National Register of Historic Places.

Pershing County Nevada Courthouse

Pershing County, Nevada was created in 1919 from neighboring Humboldt County. The new county commissioners selected the state’s leading civic architect, Frederic Joseph DeLongchamps, to design their courthouse as proof of their new independence and importance.

The Pershing County Courthouse was one of seven courthouses DeLongchamp designs in Nevada. This neoclassical-style structure satisfied the county commissioners vision of civic pride. The 16,000 square foot, single-story, circle- hexagon shaped building took its inspiration from both the Roman Pantheon and the University of Virginia Library. The interior contained an unusual layout of a central circular courtroom surrounded by offices.

The Pershing County Courthouse was unique among America’s historic county courthouses because of the circle- hexagon shape.

Decade at a Glance

The population of America was 106,521,537 with an increased average life expectancy of 54 years.

The Volstead Act became law in 1919, making the sale of an intoxicating “beverage” with more than 0.5% of alcohol illegal. The inability of government to enforce the Constitutional amendment and creating Prohibition encouraged open violation of the national law by large segments of the population.

Women voted for the first time in a national election.

The national unemployment rate was 5.2% with a worker’s pay averaging $1236 per year. Teachers’ salaries were approximately $970 nationally. The illiteracy rate was low—6% of the total population.

The improved standard of living meant that Americans could buy more—often on credit or by installment payments.

Traveling across the country was faster on 387,000 miles of paved roads. It took 13 days to reach California from New York by automobile. Travel by airplane began. Travelers could take regularly scheduled coast-to-coast flights.

The New York Stock Exchange crashed in October 1929.

Central Avenue, Los Angeles

During the late 1800s and early 20th century, African Americans began migrating to Los Angeles. In 1880, only 102 African Americans lived in the city, but by 1900 (U.S. Census) the city ranked fourteenth in its African American population. These early settlers congregated along Central Avenue and the area became a flourishing religious, social and economic hub for the community. Many of Paul R. Williams’ earliest projects were located in this area of Los Angeles.

The leading African American businesses included mortuaries, ice cream shops, cafes, and newspapers all located on or near Central Avenue. In 1928, the famous Dunbar Hotel, originally called the Hotel Sommerville, openedat 4225 S. Central. Over 5,000 people attended the grand opening. As the only hotel in Los Angeles catering to African Americans, it was a fashionable place to stay. This hotel was the site of the first NAACP national convention held in the west.

For many years Central Avenue remained an integral part of African American life in Los Angeles. It was said “you could stand on the corner of Vernon and Central and see everybody you knew… if you stood there long enough.” (Los Angeles Sentinel, April 14, 1983)

1921

1922

Early commissions for wealthy clients

Hollywood Masonic Temple, Los Angeles

Wins Special Mention in Small House Competition

Williams joins AIA and opens an office

American Radiator Building, NY

Chicago Tribune Tower

In January 1921, the Southern Chapter of AIA named the periodical Southwest Builder & Contractor as the official publication for public announcements. The June 1921 issue of Southwest Builder & Contractor listed Paul R. Williams’s official certification to practice architecture in California. Williams later became a registered architect in the District of Columbia, New York and Tennessee. (AIA Directory 1960)

Also in 1921, Williams began work in John C. Austin’s architectural firm where he wored until 1924. Austin’s firm was known for large public and commercial projects. The Shrine Civic Auditorium (pictured here) and Hollywood Masonic Temple (1922 Timeline Architecture) were projects in Austin’s firm during the years of Williams’ employment. Williams described his position in Austin’s office as draftsman.

Official Announcements

Allied Architects Association is formed

Schlinder House on North Kings Road, Los Angeles

In 1883, the New York and Brooklyn Bridge opened connecting Manhattan with Brooklyn. Engineered by John A. Roebling’s Sons Co. this structure crossing the East River was one of the first steel cable suspension bridges completed in the U.S. Still in use today the bridge is one of the oldest surviving examples of a suspension bridge.

1923

1924

Monrovia, California Administrative Group

Second Baptist Church, Los Angeles

Building Program of the Second Baptist Church

California Eagle, February 29, 1924

A newspaper article about the growth of the church proudly described Williams as “the only Negro in the United States to become a member of the National Association of Architects.”

The California Eagle, founded in 1879, was the first African American newspaper published west of the Mississippi River. The first issues of the paper encouraged African Americans in Texas to move to California.

This is a photograph of Charlotta Bass, editor and owner of the Eagle from 1912 to 1951, standing with classical actor, movie star and singer Paul Robeson in 1949.

Los Angeles Public Library

Designs for a Small Brick House Published

Designs a Public School

Proposed Y.M.C.A. Structure

Baird/Stewart/Garza ResidenceBaird/Stewart/Garza Residence

The Baird/Stewart/Garza residence, Spanish Colonial Revival style, was complete in 1926. Williams designed or specified every detail of the house and terraced garden including the woodwork, hardware, fixtures and hardscape.

1925

1926

1927

1928

1929

Frame Residence Southwest Builder and Contractor, February 19, 1926

“Glen O. Winget, Los Angeles, will build 2-sto. and part basement frame and stucco 8-rm. res., near Brockman Estate, Glendale, for Chas. R. Baird; Paul R. Williams, 1400 Stock Exchange Bldg., Los Angeles, archt: hand-made tile rfg., part basement, gas unit htg. sys., aut. water htr., hdwd. flrs., 2 tiled baths, hdwd. and pine trim, mantel.”

Lodge Will Spend $130,000 for Composite Ediface Los Angeles Times, March 12, 1926

“Plans are being prepared for a 3-story store, office and lodge building … for the Golden West Lodge No. 86 … on Central Avenue, near 36th Street, it was announced by Architect Paul Williams.

The structure will be of reinforced concrete, finished on the exterior in pressed brick and art stone …”

Lovell Beach House, Newport Beach

Two of the most famous California houses built in the 1920s were commissioned by Philip and Leah Lovell. Their town house was designed by Richard Neutra and their beach house by Rudolph Schindler. The couple’s naturopathic philosophy of the power of nature and health was promoted in Philip Lovell’s “Care of the Body” column published in the Los

Angeles Times. Free thinkers, the Lovells were interested in new ways of living and new ways of building. They embraced Schindler’s architectural philosophy of “space architecture” or “spatial relationships.”

The Lovell Beach House was completed in 1926, and architectural historians consider it Schindler’s greatest work. The suspended house of unsurfaced, poured-in-place concrete and iron rods was elevated above the beach on columns. Schindler described the open plan residence as a health house—the perfect setting for the Lovells’ way of life based on sport, health and nature. Both the Lovells and Schindler believed that social problems could be solved with architectural design.

Daniel Cowan Jackling House, Woodside, CA

Self-made millionaire and copper baron, Daniel Jackling hired George Washington Smith to design a show-place home in Woodside, California. Smith was the foremost proponent of the Spanish Colonial Revival-style of architecture and created Santa Barbara’s unique architectural look.

In the 1920s, Woodside was one of the wealthiest small towns in America and the client directed the architect to design an appropriate mansion to represent his new social and economic position in California society. The 17,250 square-foot, 30-room residence was the perfect setting for Jackling’s extensive art collection.

The Jackling House is currently owned by the late Steve Jobs, CEO Apple Computers. Jobs called the house “one of the biggest abominations of a house I’ve ever seen” an opinion not shared by preservationists fighting to preserve it.

Continues to receive commissions for Flintridge estates

John Bishop Green hired Williams to design a large weekend home including the latest “modern” conveniences—electric refrigeration and automatic water heaters.

Los Angeles Times (June 5, 1927) described this new residence in Flintridge as a project by “Paul Williams, one of Southern California’s best-known architects.”

The Mississippi River Flood of 1927

In 1927, the Mississippi River flooded the central United States and displaced nearly a million people. The river inundated small towns and farmland. African Americans left the stricken rural areas in great numbers to settle in new areas of opportunity such as Chicago and the west. The African American population in Chicago increased from 44,000 in 1910 to 233,000 in 1930.

This natural disaster transformed American society and politics and contributed to the exodus of African Americans from the Mississippi River Delta. (John Barry, Rising Tide, 1997)

Ensenada Has New Hotel

Los Angeles Times, June 5, 1927

“A new $300,000 hotel of Spanish design is being constructed on Todos Santes Bay at Ensenada, Lower California. An organization of prominent businessmen and sportsmen has been completed to take over the contract… Plans for the hotel have been made by Paul Williams.”

Hollywood YMCA

Williams’ firm was hired in 1927 to expand and improve the Hollywood YMCA. Williams’ building opened in 1928. Similar to the 28th Street YMCA, this building was considered Spanish Colonial Revival with ceramic and terra-cotta interior decorative details. Unlike the 28th Street Y, there was only one main entrance. Williams reconsidered the users circulation within the building allowing the managers more flexibility and encouraging members to participate in different activities.

New Structure Scheduled for Santa Monica

Los Angeles Times, April 29, 1928

“Bids are being taken by Architect Paul R. Williams for the construction for L. H. Turnbull of a Class A. two-story and part basement store and office building on Wilshire Boulevard between Third and Fourth streets, Santa Monica. It is announced.”

Chrysler Building, New York

Walter P. Chrysler, wealthy automobile magnate, hired architect William Van Alen to design an office building in New York City tall enough to symbolize the height of his financial success. Van Alen, known for his flamboyant designs, met the challenge with plans for a 77-story, Art Deco-style building. The building was the first in the world to exceed 1000 feet. To ensure the claim to the title of the tallest structure, the architect secretly assembled a 27-ton steel tip to be hoisted and unveiled at the last minute. Chrysler and Van Alen’s victory was short lived when the taller Empire State Building was completed in 1931.

First Electric Refrigerator

One of the first electric refrigerators rolled off the assembly line on October 15, 1928.

In 1945, Paul R. Williams wrote in Small Homes of Tomorrow that refrigerators of the future will have many new innovations including an “automatic ice cube ejector.”

Williams continues to design homes for wealthy during Great Depression

Katherine Peachy hired Williams to design her house in Hancock Park—a development for wealthy Angelenos. Some of Williams’ original design details could not be executed until 1933. Many building projects were down-sized because of the Great Depression.

Atkin Residence

Jack P. Atkin moved into his luxurious 12,000 square-foot home, designed by Williams, in 1929 on the eve of the Great Depression. Atkin asked the architect to design a castle on a hill that would bring back “memories of his childhood in England.” The 16-room Tudor Revival-style residence in Pasadena was built of brick with a slate roof. Williams utilized expensive materials including oak, marble, custom designed stained and leaded glass, and “In-Vis-O” Roller Screens for windows—all at Atkin’s request.

Atkin rented the property to movie studios and the house was the setting for the movies Topper (1937) and The Bells of St. Mary’s (1937). The famous residence was destroyed in a 2005 fire. Photograph courtesy of J. Troutoux.

Honor Goes to Colored Architect

Los Angeles Times, December 1, 1929
Paul R. Williams Named to Board That Will Erect Negro Memorial

“Paul R. Williams, local negro architect, has been appointed by President Hoover to membership in the National Colored Memorial Commission which is to erect a memorial building as a tribute to the services rendered by the colored men during the World War … It was through the efforts of the Chamber of Commerce that Williams’s name was brought to the attention of the President.”

Exhibitions Opened At Art Center
Content

Los Angeles Times, December 2, 1929

“Two special exhibitions were opened at the galleries of the California Art Club in its Barnsdall Park Art Club yesterday, one of them being a collection of seventy canvases of the leading Negro artists of the United States … This exhibition, which will be on view for the next two weeks, was secured for this city by Dr. Elzora Gibson. Three local artists are represented in it, Constance Phillips, Paul R. Williams and A.F. Taynes, the latter two of whom are also architects.”

US Stock Market Crashes: the Great Depression Begins

On October 29, 1929, the Stock Market crashed and signaled the beginning of the Great Depression. Depositors, fearful that the banks would not honor their accounts, rushed to withdraw their money. In this photograph a crowd gathers in the rain outside the Bank of United States. Consumers began to curb all spending and large building projects were put on hold.

The Great Depression lasted through the next decade. At the height of this economic down-turn almost half of the African American population of Los Angeles was unemployed. (Encyclopedia of African American History: 1896 to the Present)

Santa Barbara County Courthouse

When the William Mooser Company was selected in 1926 to design a new county courthouse for Santa Barbara, it was the state’s oldest architectural firm. Three generations of Mooser’s design many important public and private buildings in the San Francisco area. The youngest Mooser, William III, a graduate of the Ecole des Beaux-Arts in Paris and a 17-year resident of France and Spain, created a new courthouse to replace the one destroyed in the June 29, 1925, earthquake. Architectural historians described his design as “the greatest Spanish Colonial Revival structure ever built.”

The L-shaped, stucco, terra cotta, sandstone building with wrought iron ornamentation opened in 1929. The courthouse inspired others in the Santa Barbara community to celebrate their Spanish roots and appreciate vernacular materials and craftsmen. (Vernacular architecture uses materials and ideas common to a geographic or cultural area.) The Spanish castle design, complete with a clock tower and extensive landscaping, remains the seat of government for modern Santa Barbara County.

Dymaxion House

In 1929, Buckminster Fuller unveiled a 3-ton prototype of his circular Dymaxion Dwelling Machine in Marshall Field’s interior decorating department in Chicago. Fuller promoted the prefabricated structure of lightweight steel, duralumin and plastic as a temporary, transportable living space and a product well-suited for mass-production techniques. The Dymaxion (Dynamicmaximumion) was Fuller’s interpretation of Le Corbusier’s architectural philosophy—a dwelling is a “machine for living in.” The Dymaxion was a legendary futuristic design of the 20th century.

Richard Buckminster Fuller—philosopher, designer, architect, artist, engineer, teacher and inventor—was driven by his philosophy of creating “more for less.” Though architects and the public are engaged by the Dymaxion House, only one full-scale residence was built in Wichita, Kansas. In the 1960s, Fuller was embraced by American counterculture and environmentalists as the inventor of the multifunctional geodesic dome.

Home Designs in LA duplicated elsewhere

In an article in the Los Angeles Times (July 24, 1927), Williams described instances where visitors to the city saw his home designs and wanted to build a duplicate home. “The Spanish homes built here are usually a wonderful improvement on their prototypes in Europe, a thing that is generally admitted by visitors here from Spain.”

Williams was known throughout his professional career as one of the best California practitioners of revival-styling. His residential architecture in the Spanish Colonial style, as reflected in the Baird/Stewardt/Garza house, was highly prized by up-scale modern home-buyers in Los Angeles.

28th Street YMCA is completed

Williams’ design for the 28th Street YMCA in the Central Avenue area of Los Angeles included Spanish Colonial red clay roof tiles, a row of arched windows on the second-floor and smooth stucco finish. Bas-relief panels with busts of African American heroes including Booker T. Washington and Frederick Douglass provided decorative detail in terra cotta with vines and scr

Paul R. Williams wrote about important developments in electric lighting in his 1945 book The Small Home of Tomorrow. “New methods of indirect lighting built into the design of the room with tiny concealed adjustable spotlights for reading areas will be one of the post war developments.”

1930

Decade at a Glance

There were 48 states in the union with a total population of 123,188,000. Life expectancy improved, with white men living an average of 58 years and white women 61 years.

During the Great Depression unemployment reached 25% with some homeless living in shanty towns known as Hoovervilles. Many people moved to California from Texas, Oklahoma and the South to escape dust, drought and poverty.

The employed were paid an average of $1,368 per year. Milk cost 14¢ a quart and round steak 42¢ a pound. Zippers take the place of buttons and hooks in women’s clothing.

During the decade 2,787,400 cars were sold to Americans. In New York City the design of the Empire State and Chrysler Buildings were inspired by the visualization of speed.

Amelia Earhart was the first woman to fly solo across the Atlantic. Jesse Owens, an African American athlete, won four gold medals at the 1936 Olympics in Berlin, Germany.

Congress designated the Star Spangled Banner as the national anthem.

Williams designs for Hollywood elite

Hollywood was “depression proof.” During the Great Depression, the public went to the movies to forget their problems and enjoy the luxury of air conditioning. The famous Hollywood sign was erected in 1924 to promote a neighborhood development Hollywood Land. The sign became a symbol for glamorous Hollywood.

The Depression slowed work for many architects, but Williams’ office remained busy. By 1934 Williams completed over 36 residential estates. Many of his clients were important in the movie industry — directors, movie stars, producers, set designers, even make-up artists — including Otto Preminger, Corrine Griffith, Burt Wheeler, Lon Chaney, Bill (Bojangles) Robinson, Charles Correll and Jacob Paley.

In addition to his work on residential estates, Williams designed many of his most memorable commercial projects in this decade: Angelus Funeral Home, Music Corporation of America (MCA) headquarters, Saks Fifth Avenue and Sunset Plaza Apartments. He also began a life-long relationship with Howard University.

Hollow Glass Building Blocks

In the 1930s, hollow glass blocks are frequently used as a building material in the Art Moderne-style of architecture. A style popular with Americans from all socio-economic levels, Art Moderne reflected the country’s mid-twentieth century excitement with speed and technology. As an inexpensive structural element, glass blocks allowed light to be a design component without adding extra ornamentation.

This photograph from the Bureau of Standards in Washington, D.C. shows the glass blocks being tested to certify them safe as a building material.

Paul R. Williams used glass blocks as a light source and decorative element in his 1939 Loomis Manor Apartments in Reno, NV. Architect Walter Gropius used a glass block wall to line the entryway of his 1938 house in Lincoln, MA.

Thoughts on the Role of Interior Decorators

In an interview in 1970 with the Los Angeles Times’ Maggy Savoy, Williams discussed his philosophy of design: “…know when to quit … People don’t always know what they want. It is the architect’s job to help them find it, and keep within the bounds of grace.”

When starting a project, Williams prefered to employ the ideas of an interior designer early in the process. In his career, Williams wored with many important designers and design companies: Harriet Shellenberger (image), Bullocks of Los Angeles, Frank Baden of Webber Spaulding, Dorothy Draper, Edward F. White, Paul Laszlo & John Luccareni.

Sorority’s Westwood Home Built

Los Angeles Times, April 27, 1930 Chapter House Reflects California and Colonial Influences

“Alpha Delta Pi Sorority house on Hilgard avenue, Westwood Hills, is declared to be one of the best examples of California-Colonial on sorority row at U.C.L.A. … Frank Baden of Webber and Spaulding, the interior decorator, carried out the Monterey atmosphere in Spanish hand-carved benches and tables, parchment shades, damask-covered chairs, colonial fixtures and etchings.”

Empire State Building, New York

In the 1920s, automobile magnates Walter Chrysler and John J. Raskob (General Motors) raced to see who could build the taller building. Chrysler hired architect Walter Van Alen to design his project (the Chrysler Building). Raskob, investors and former N.Y. Governor Al Smith teamed-up to build the Empire State Building. Their building, by architect William Lamb, was 1,454-feet (1/5th of a mile and 103 floors) and surpassed the recently completed 1,046-foot Chrysler Building.

Small House Plan Service publishes winning design

In 1923, Paul R. Williams won an honorable mention for his design of a small house entered in a competition sponsored by the Community Arts Association of Santa Barbara. The Community Arts Association was a pioneer in the movement to develop “better standards of small house architecture.” Eight years later, his winning entry was included in a catalog of designs published by Theodore A. Koetzil, director of the Small House Plan Service. Koetzil selected the Williams’ design for publication in his catalog because “on studying the design today it is found still to hold its position in the first rank…the design is unquestionably good architecture of today.” (Los Angeles Times, December 6, 1931)

Beverly Hills Market Built for Actress

LA Times, February 3, 1931

Corrine Griffith, retired silent movie actress, hired Williams to design a general market building in Beverly Hills—the first commercial building in the area.

Domestic Architecture

Architect and Engineer, October 1931

“In an exhibition of residential architecture, featuring the work of Paul Williams, architect … in the Architects Building Materials Exhibit … outstanding in this collection of photographs, renderings and sketches, are those of the E.L. Cord residence, now under construction in Beverly Hills. This home is said to be an unusually large example of the Southern Colonial style of architecture.”

When the Cord Mansion was completed in 1933, every aspect of the home was covered in contemporary popular and trade magazines: the pool, the game room, bar nook and stables (California Arts and Architecture), the interiors (Architectural Digest) and the general style (Architect and Engineer).

1931

1933

Williams is active in the community

Busy Building Program Proceeds This Month

Griffith Observatory

1934

Square Shadows, Montgomery, Pennsylvania
S.C. Johnson & Sons Co. Building and Research Tower, Racine, Wisconsin

Federal Housing Admininstration Created

Fallingwater, Bear Run, Pennsylvania

1935

Begins work with Hilyard Robinson

Williams is recognized as an expert

Becomes a Spokesman for New Building Technology

Book Features Homes

Travel Guide for African Americans: The Green Book

California House and Garden Exhibition

New Orleans House Based on Williams’ Model French House

Speaker at Hampton Institute

Williams was one of the speakers at the Thirteenth Hampton Builders’ Conference Program. This annual conference was co-hosted by Hampton Institute and the National Builder’s Association, the national organization for African Americans involved in the construction industry and building trades. Williams lead an open discussion on “national building problems.” (The New York Age, February 13, 1937)

I Am a Negro

This essay by Williams was published in the July 1937 issue of The American Magazine. The essay was described by the editor as “the frankest, most human discussion of the color problem we have ever read.” This autobiographical essay was edited and reprinted almost 50 years later after Williams died in Ebony (November 1986).

Going Forward with Southern California

Los Angeles Times, June 27, 1937 Business and Civic Leaders of Los Angeles and Southern California. Among these were many who have assisted in making Los Angeles and Southern California the most progressive section in the world.

Paul Williams’ picture was included in photographic gallery with the caption “Architect who has designed over 400 homes in the vicinity of Southern California.”

Others in the gallery included: Alex B. Perino (Perino’s Restaurant), George Pepperdine (educator, philanthropist), A. M. Beaver (realtor), A. W. Ross (developer Wilshire Boulevard), Brigadier Joseph Sturm (head LA branch Salvation Army).

1936

1937

Distinguished Negroes and Their Work: Paul Williams, Architect

Across America, Williams’ essay I Am A Negro generated discussion in both mainstream and the African American press. Valdemar Hill’s editorial in the Virgin Islands Daily News on December 1937 was an example of this debate. Hill defended Williams as a “sane, practical Negro who has no illusions regarding the present racial situation … Although he can easily pass for white, Paul Williams has chosen to be distinctively Negro. He fully understands that as Paul Williams, the individual, he can go anywhere, do anything without reproach; his limitations are due to the fact that he is a Negro.”

The debate about the real meaning of Williams’ essay for modern American society c ontinued. His ideas were embraced by both conservative and liberal pundits.

Golden Gate Bridge, San Francisco

Golden Gate Bridge construction began January 5, 1933 and opened in May 1937. Spanning the Golden Gate Strait (or Chrysopidae), it conected San Francisco with Marin County. This structure was known as one of the world’s most beautiful examples of a suspension bridge. Bethlehem Steel Co. provided the fabricated steel that was transported to California via the Panama Canal. The steel cabling was provided by John Roebling’s Sons Company. From the time of construction until 1964, the 4,200-foot bridge had the longest span of any bridge in the world.

Consulting Architect Irving Morrow selected the bridge’s distinctive International Orange color. Morrow believed this warm color blended harmoniously with the setting and set the bridge apart from the cool color of the water and sky. The bridge was an important California landmark, appearing as a backdrop in more than 20 major motion pictures including the Star Trek film series, Alfred Hitchcock films and The Maltese Falcon.

Music Corporation of America

Williams’ practice eexpanded to include commercial buildings with a residential feel. The MCA building was an example one of Williams’ most famous commercial buildings. This building was featured on the cover of the October 1938 issue of California Arts and Architecture.

Architectural Problems Told

Los Angeles Times, March 24, 1938 Paul R. Williams gave his views on style and design

“Ornament is what dates a building … In designing all kinds of buildings, I have found it better to rely on good proportions in design to attract attention. The factors that do not tire the eye are those which do not easily become antiquated.“

He continued “… today, discriminating home owners demand an abode that reflects their own personality, satisfies their own particular needs, as well as meeting the ordinary requirements of a well-built home.“

This article described a similar philosophy for commercial buildings. “… Williams studies the type of business to be served and adapts the entire structure to meet its requirements … the recently completed California offices of the Music Corporation of America … in a similar manner combine decorative and functional features in its design.”

Music Corporation of America (MCA), 1939. Photographer: Maynard L. Parker, The Huntington Library, San Marino, California.

Trinity Church Faces Busy Week

The Spartanburg Herald, Spartanburg, South Carolina, March 14, 1938 Members to Begin Building Program Here Wednesday

“Contract for construction of the building was let several days ago to the Fiske Carter Construction company, and the preliminary work of clearing off the site of building was begun last week. Paul Williams is the architect … The new building will be of Gothic design.”

Housing Affairs Deeply Studied

Los Angeles Times, August 21, 1938 California delegation at International Congress in Mexico

“With housing and city planning looming large in the affairs of the day, the studies and analyses at the sixteenth International Housing and Town Planning Congress, which ended its week of sessions at Mexico City yesterday, are expected to have marked international influence.” Paul R. Williams is among the delegates.”

Gropius House, Middlesex County, Massachusetts

Mrs. James J. Storrer donated 5 acres to German emigre architect Walter Gropius for his family home. Gropius, leader of Germany’s influential Staaliches Bauhaus (1919-1928), fled a hostile German government in 1934 and joined the faculty at Harvard, Graduate School of Design.

The Gropius House was built in 1938. The design was attributed to Walter Gropius and Marcel Breuer, with input from Gropius’ wife and daughter. The wood, painted brick and fieldstone house was inspired by traditional box-like New England buildings that Gropius finds “unpretentious and genuine in plan and appearance.” He added sculptural Bauhaus elements—an exterior metal spiral staircase, glass block wall at the entry, chrome details, and vertically-hung clapboard. Gropius sited his home with views of planned and natural landscapes as design elements. Historians now equally value the landscaping and the building as important reflections of “modernist spatial philosophy.”

The architectural design and interior furnishing for the Gropius House were inspired by the Modernist or International-style. In a 1932, Museum of Modern Art (New York) exhibition catalog, the aesthetic principles of the International Style were explained to American audiences by Henry Russell Hitchcock, Jr., and Philip Johnson: “A sense of volume as opposed to solidity, regularity as opposed to symmetry, and detail achieved through intrinsic elegance of materials, technical perfection, and fine proportions as opposed to applied ornament.”

Magazines and newspapers wrote extensively about the Gropius House while scores of Harvard students participated in the design and construction. The house created a public appreciation for the International-style in America. While not the first Modernist or International-style home built in this country, the Gropius House was the most influential.”

Fiberglas

The Architect’s Notebook in Paul R. Williams’ The Small Home of Tomorrow (1945) described the importance of using the best insulation materials in a “successful postwar home.” In 1931 Russell Games Slayter, an Owens-Illinois Company employee, realized the value of the crude glass fibers floating in the air and hanging from rafters in the company factories. Throughout history many incorporated glass with other materials, but Slayter was credited with the title of “Father of Fiberglass.” Owens-Illinios merged with Corning Glass in 1938 to form Owens-Corning Fiberglass and manufactured glass fiber insulation a product that improved residential heating/cooling efficiency. With this insulating material available during the post World War II building boom, homes were built in environments previously considered too cold, hot, dry or humid.

Herculite tempered glass

The Pittsburgh Plate Glass Company (PPG) opened in 1883 and was the first successful American manufacturer of high-quality, thick glass. PPG continued to improve their glass production process and the glass became thinner and more affordable for commercial and residential buildings. In 1907 the company opened its first window-glass factory and by 1928 began producing sheet glass. PPG’s Herculite, developed in 1938, was a tempered glass four to five times stronger than ordinary plate glass. The large sheets of safer Herculite were a new building material and inspired architects to design glass-clad buildings. Architects could now create buildings with large display windows as an architectural element ntroducing natural light and providing unobstructed views.

Receives AIA Award of Merit

Williams recieved an Award of Merit from the Southern California (Los Angeles) Chapter of AIA (American Institute of Architecture) for the Music Corporation of America building.

Extensive New Store Unit to be Opened Tomorrow

Los Angeles Times, August 20, 1939

“The doors of the newly completed five-story addition to the Saks Fifth Avenue store … Beverly Hills, are scheduled to be opened tomorrow … The charm of the original building continues through the new addition. There is a series of rooms decorated and furnished in keeping with the type of merchandise displayed … The beautiful restaurant on the roof will be supervised by Alexander D. Perino … Architect Paul Williams designed the building” and the interior in collaboration with Tom Douglas.

This photograph of Saks interior is by Maynard L. Parker courtesy of The Huntington Library, San Marino, California.

Century of Progress Architectural District—Beverly Shores, Porter, Indiana

The Chicago Century of Progress Exposition opened in 1933 and focused on science as a catalyst for 20th century America. Ten furnished models of modern home designs used innovative and prefabricated construction, futuristic materials and appliances of tomorrow. Nine of the homes featured flat roofs “for sleeping at night and for sunbaths, loafing or general use by day.” (image 1) Promoted as housing for every-man, the costs ranged from $3,500 to $25,000—a stretch for home buyers during the Great Depression.

After the Exposition, Robert A. Bartlett purchased 5 of the models and moved them to Beverly Shores in Porter, Indiana for his 3000-acre Lake Michigan subdivision development. Bartlett embraced modern architecture and the Century of Progress models to promote Beverly Shores as the place for the latest construction available. He believed the “model homes represent … the most outstanding examples of modern home building, combining beauty and practical value. We believe they will have a decided influence on home building in metropolitan Chicago.”

Construction innovations include:

  • Wieboldt-Rostone House was framed in steel and clad in the experimental material Rostone—a composite of shale, limestone and alkali produced in a variety of colors. (images 1, 2)
  • Florida Tropical House, a landmark in Beverly Shores with its bright pink exterior, blended the indoor and outdoor living space—an unusual concept in the Midwest. (image 3)
  • Cypress Log Cabin demonstrated the unique building qualities of cypress—a durable, colorful wood resistant to moisture, heat and insects. (image 4)
  • Armco-Ferro House was easily mass-produced and affordable (under $3,000). Made of corrugated steel panels bolted together, the structure resembled a cardboard box and can be placed on its bottom, side or top without damage. The steel panels were covered with porcelain-enamel produced by the Ferro Enamel Corporation. (image 5)
  • House of Tomorrow, influenced by European Modernism, was made of steel and glass. The curtain wall, a primitive passive solar heating system, reduced the need for mechanically produced heat in winter. The model was cooled by a revolutionary home-sized air-conditioner. (For the Midwest Bartlett replaced the glass walls with operable windows.) The first floor of the model was a garage/airplane hangar. Early 20th century futurists believed every modern American family will own a personal airplane. The second and third floor living spaces were built around a solarium. (image 6)

     

    In 1983, the Beverly Shores/Century of Progress Architectural District was added to the National Register of Historic Places

Taliesin West, Scottsdale, Arizona

Frank Lloyd Wright, one of the most famous architects of the 20th century, began work on Taliesin West. Wright called this low-profile residential/working complex on 800-acres his “Arizona Camp.” The architect imagined the desert site as his family winter retreat and workshop for the Taliesin Fellowship student-apprentices. Beginning in 1937, he stayed at the site from November to April. He continued to alter and add to the project until his death in 1959.

Inspired by the “character and beauty of that wonderful site” and impatient with the “meaningless convention” of current aesthetics, Wright’s vision was that the buildings should blend with the natural setting. Using indigenous materials—volcanic rock set in wooden forms and bonded with a mixture of cement and desert sand (desert concrete)—his design blured the distinction between indoor and outdoor space. Architectural historian Paul Heyer described the complex as a “progressive spatial experience: a series of events in landscape and terracing, with alternation of tight and loose and dark and bright spaces.”

Wright’s design plan was all encompassing and included the landscape and interior furnishings. Wright painted the exterior Cherokee red because he believed that red is the “one life-giving color in creation.” The rough redwood timbers were decorated with white to mimic the native saguaro cactus. To provide light and a sense of space, canvas was installed on the roof and windows. In 1945, Wright replaced the cloth with more practical glass and plastic.

Noted by historians as one of Wright’s later architectural masterpieces, Taliesin West was added to the National Register of Historic Places in 1982.

1938

1939

1940

Decade at a Glance

The U.S. population increased to 132,122,000 with over 8 million people unemployed. Life expectancy was 68 for women and 60 for men.

The average annual wage was $1,299 and a minimum wage wasset at 43¢ per hour. Teachers earned $1,441 per school year.

The U.S. Supreme Court ruled that African Americans have the right to vote.

There were 34,500 people killed in auto-related accidents.

More than half of all U.S. homes have indoor plumbing improving public health. The first eye bank opened in New York. Penicillin was developed. This antibiotic improved the survival rate of American soldiers wounded during WW II.

The war effort encouraged the development of many new technologies and the employment of women.

The end of the war changed the balance of world power; the U.S. and the USSR emerged as super powers. A new war began—the Cold War.

Plans for home bomb shelters were popular.

Case Study Houses

John Entenza, the editor/owner of Arts and Architecture, annouced in the magazine’s January 1945 issue a program promoting new design and construction ideas for the exploding post World War II housing market. The magazine challenged architects to create real houses for Joes and Janes, not concept houses. Each home “must be capable of duplication and in no sense be an individual performance…It is important that the best material available be used in the best possible way in order to arrive at a good solution of each problem.” The program was christened as the Case Study House Program. Over 31 architects accepted commissions in association with the program designing residences on sites in greater Los Angeles. The architects submitted 34 designs over two decades. Arts and Architecture featured photo essays of the homes with images by some of the most famous photographers of the time. The program continued from 1945-1964 and profoundly impacted public taste and expectations across the country.

Named to California Draft Board

The Governor of California named Paul Williams to one of 107 district draft boards. The boards administered the Selective Service Act in the State. Williams’ nomination was approved by President Roosevelt.

Several nominees had to withdraw because they were called into military service or their “business affairs would not permit participation.” (Los Angeles Times, October 10, 1940)

Ralph A. Vaughn, a young designer in Williams’ firm, remembered in an oral history that Williams closed his office shortly after December 7, 1941 or Pearl Harbor. (Wesley Henderson interview with Vaughn, 2/16/92)

Negro Architects of Today in Action

“Reviewing the homes designed by Williams is like reading a page from Hollywood’s Blue Book, namely: Will Hays, Tyrone Power, Sally Eilers, Zasu Pitts, Leon Errol, Grace Moore, Richard Arlen, Charles Correll (Andy of ‘Amos ‘n’ Andy’), Bill Robinson, Joseph Schenck, Jay Paley (of Columbia Broadcasting Co.) and many of the executives and producers in the motion picture industry.”

Homemaking Institute at Dillard University

The New York Age, March 30, 1940

“The Institute, sponsored annually by the University, will be centered this year around ‘The Planning and Decoration of the Home’ and will be conducted by Paul R. Williams, noted architect of Los Angeles, California. The Institute will open on Monday, April 1, with a lecture by Mr. Williams on planning a low cost home.”

The Home Front: Columbia, a Country on the Uptake

Los Angeles Times, April 14, 1941

“I’ve been talking with Paul Williams, the Negro architect, and he told me about Colombia, a country which is on the uptake … Mr. Williams actually has BEEN there … the new thing about Colombia is that it is building a big city hotel, office buildings, clubs, homes … all along the most advanced style … A commission was sent to the States to study the hotel architecture … When the commission reached Los Angeles, it was so enchanted … it decided right then and there … that this was the spirit it wanted. Mr. Williams got the job … The selection of Mr. Williams to do the job was a nice compliment to Los Angeles.”

The image of Hotel Nutibara is a rendering by R. Lockwood for Williams’ office to present to the Colombian clients. This photograph is from The Huntington Library Maynard L. Parker archives.

Williams in Home Show

“California Architecture” was the theme of the 1941 Los Angeles Home Show. Air, sunlight and space were important elements used to define this developing style. Photographs, sketches and models by architects Richard Neutra, R. M. Schindler, Cliff May, John Lautner, Lloyd Wright and Paul Williams were among those whose work best illustrate “California Architecture.” (Los Angeles Times, Jan 19, 1941)

Lincoln University Honor

“Paul Williams, celebrated Los Angeles, Calif. architect, … received the honorary degree of Doctor of Science at Lincoln University, Mo., June 10, 1941.” (The Crisis, July 1941)

War! Oahu Bombed by Japanese Planes

The Honolulu Star-Bullentin 1st Extra, December 7, 1941

In the first indication of an attack on Pearl Harbor, Lt. Cmdr. Logan Ramsey sent this message to all U.S. Navy Ships: “Air raid on Pearl Harbor [stop] This is no drill.”

War Must Be Fought On Two World Fronts

New York Times, December 14, 1941

“The most extensive and most devasting war in history began a new and fiercer chapter last week. Many smaller nations followed Japan and the United States into the swift-moving War of the Continents and by the week-end some 34 countries or dominions were at war, with only a handful of neutrals still clinging to a precarious non-belligerency.”

Tile Is Sumptuous in Swimming Pools

Architect and Engineer, April, 1941

“Nothing is more beautiful than tiles, either plain or in designs seen through water. Clear green and blue colors make the water particularly attractive. Above is the corner of a pool at the home of Jay Paley at Beverly Hills, California of which Paul Williams is architect.”

Elizabeth Gordon is editor of House Beautiful

Gracious living magazines were important influences on the 20th century American middle-class consumer. These publications helped readers define and live a good life. They were consulted by those who had arrived and sould afford an architect and decorator as well as those who only aspired to that life. Powerful editors determined the tone for each magazine and set aesthetic agendas.

Though the circulation for House Beautiful (1896) was not the highest, editor Elizabeth Gordon was one of the most important advocates for an American life-style. Serving as editor from 1941-1964, Gordon’s philosophy on anything and everything pertaining to the home was an important influence on consumer choice. Gordon guided her readers in evaluating, selecting and tastefully displaying the material elements of style according to percepts in monthly editorials. She encouraged readers to embrace order and beauty to ensure the ideal family environment. Gordon believed living the ideal life meant “not making mistakes in taste, not serving tasteless food, not blundering socially … being open to new possibilities of choice.” (Albert Roland. The Antioch Review Autumn, 1961)

Elizabeth Gordon used photographic essays to illustrate her aesthetic philosophy. She selected American photographers, interior designers and architects to promote her vision to build “a compelling visual bridge between the forgotten past and the imagined future.” (Jennifer A. Watts. Maynard L. Parker, 2012) In this image Gordon features a 1941 desk detail by the magazine’s in-house decorator Dorothy Lambertson. In House Beautiful Gordon frequently featured Paul Revere Willliams’ homes designed for movie stars and wealthy clients as her trend setters.

1941

1942

Pueblo del Rio opensPueblo del Rio opens

War time projects

The Chicago Bee

Bel-Air Gardens Tour Set

Wallace Neff Invents Airform

1943

Aluminum City Terrace, Westmoreland, Pennsylvania

Farnsworth House, Plano, Illinois

1944

Completes Work on Roosevelt Naval Base Project

Williams Pursues Other War Contracts

Soundings: USO Homelike

Career Used to Promote War Effort

Everybody There

Japanese Utterly Beaten says MacArthur

Williams publishes two books

Imposing New Buildings in Colombia, S.A., Designed by Los Angeles ArchitectImposing New Buildings in Colombia, S.A., Designed by Los Angeles Architect

The Wilfandel Club of Los Angeles Established

The House i want

The Times (Los Angeles), January 26, 1889

“Kate Field has written a pleasant letter…in which she discourses of the winter resorts of California, and also refers to those old monuments of a past civilization still remaining in our midst. She says: ‘There appeared in the New York Critic a communication to the effect that the much vaunted missions of California were architecturally beneath contempt, and that Helen Hunt Jackson was indebted to her fancy for her praise of these ruins….If there be churches elsewhere as picturesque as the restored mission at Santa Barbara or the (alas!) unrestored San Luis Rey… I know not there existence.’ “

Casa de Rancho Camulos, pictured here, is an example of a California mission immortalized in Helen Hunt Jackson’s novel Ramona.

1945

1946

1947

1948

1949

Designer for Living

Ebony, February 1946 America’s ace architect Paul Williams attains fame and fortune blueprinting stately mansions

“In a nation where Negroes live in architectural atrocities of slums and shanties, a Negro has become one of the foremost designers of vast, stately country houses and estates. He is tall, handsome, white-haired Paul Williams, one of America’s most successful architects …. Paul Williams does not think as most American Negroes. He believes race prejudice can be conquered by individual achievement, rather than mass pressure.”

This Maynard L. Parker photograph of the Lilian residence captures a feature Williams is noted for including in his stately homes and estates. (Huntington Library, San Marino, California)

Tennis Club, Palm Springs

The 1947 Palm Springs Tennis Club additions were a joint design project by Paul R. Williams and A. Quincy Jones. From 1939 to 1940, Jones worked as an architect in Williams’ firm, but by the time of this club redesign, they were collaborating as equals. Their vision transformed the existing club with its traditional tennis courts, swimming pool and dining room into a complex that fit naturally into the desert environment.

Appointed by Governor to State Agency

Governor Earl Warren recognized Williams’ character and integrity by appointing him to the State Redevelopment Agency. (1957 letter from the Governor of California in AIA file.)

Masterful Planning and Execution Mark Palm Springs Tennis Club Expansion

Southwest Builder and Contractor, May 23, 1947

“Under the guiding hands of Architects Paul R. Williams and A. Quincy Jones, Jr., Los Angeles, the Palm Springs Tennis Club recently underwent a remarkable transformation … They solved many site-planning and design problems in a new and most interesting manner … Liberal use of large glass areas was deemed a necessity for the complete capturing of a glorious view, and served as a method of literally tying the outdoors into the indoors.”

Photographs and descriptions of this commercial remodel are published in contemporary magazines including Arts & Architecture, Progressive Architecture and Architectural Digest.

Levittown, Long Island, NY

On 1,200 acres of Long Island farmland, home builders Levitt & Sons began to work on their revolutionary vision for the American housing industry. Their dream was to become the General Motors of this industry. The Levitts reduced construction to its basic parts, skillfully moving crews from site-to-site as their task was complete. They were the first home builders to apply assembly-line principles to home construction on a massive scale. Reducing the per unit cost, they opened home ownership to more Americans. The company bragged that a Levitt home was “the best house in the U.S.”

A Long Island potato field was named Levittown. Within three years 40,000 people moved into 10,600+ houses priced at $7,990. Uniform in design, size and limited customization, the affordable homes changed the antiquated housing industry. Levitt & Sons’ methods of mass construction were copied across the country, enabling builders to meet the postwar demand. Levittown was often cited as the beginning of the biggest housing boom in U.S. history.

St. Louis Arch, The Jefferson National Expansion Memorial Arch

Luther Ely Smith, a St. Louis lawyer, envisioned a riverside park to commemorate the city’s role in opening the American West. He promoted the park to revitalize the blighted riverfront district and created jobs during the Great Depression. After World War II Smith raised $250,000 to finance an architectural competition for a design to symbolize American culture and civilization. In 1947, the competition jury unanimously selected entry 144, Eero Saarinen’s design for a stainless-steel arch with complementary landscaping.

Born in Finland, architect Eero Saarinen was not restrained by convention. His memorial design was inspirated by Thomas Jefferson’s vision for America and the modern age. “The major concern…create a monument which would have lasting significance and would be a landmark of our time…Neither an obelisk nor a rectangular box nor a dome seemed right on this site…But here, at the edge of the Mississippi River, a great arch did seem right.”

Construction of the Arch began in 1963 and was completed in 1967. Saarinen’s design was an inverted catenary curve, a shape similar to a heavy chain hanging between two supports. Based on a complex engineering design, the structure was built with no interior skeleton. The park encompassed 62-acres. The Arch was 630 feet tall, 630 feet from leg-to-leg and was covered by 886 tons of stainless-steel plate with an inner skin of 2,157 tons of carbon steel.

Advises on movie Mr. Blanding Builds His Dream House

In the 1948, RKO movie Mr. Blanding Builds His Dream House, Mr. Blanding (Cary Grant) experienced building a home working with an architect, lawyers, builders and workmen. This is the first time in film history that a real house was built for a movie set.

“Those who have shuddered slightly at the prospect of what Hollywood will do with Mr. Blanding Builds His Dream House may comfort themselves in the news that the Southern California Chapter, AIA, is on the job. Its president has appointed Robert Alexander, Welton Becket and Paul Williams to serve as a special committee to work with William Pereira—also AIA—in trying to make the film a fair representation of architect-client relationships.” (Journal of the American Institute of Architects, September 1947)

The General Electric “Dream Kitchen” featured in this movie was an early example of product placement in film.

How to Build a Home for $5,000 as told to Ebony

“Start small … Build a small house now, one that is a complete and attractive unit in itself, but has a floor plan designed to take more rooms as needed or as your budget increases … But be sure your plan will give you a pleasing house inside and out …”

Williams predicts that the “old-fashioned” living room will disappear in modern American homes. Living rooms will become “informal recreation and leisure rooms that open on a backyard garden.” (Ebony, March 1949)

This Williams’ floorplan for a 1960s development illustrates the informal recreation/leisure room he describes in the Ebony article.

Golden State Mutual Life Insurance Company headquarters opens.

The new Golden State Mutual Life Insurance Company headquarters was officially dedicated in a week long celebration in August 1949. Over 10,000 toured the building, including corporate officers, California Governor Knight, State Insurance Commissioner Downey and architect Williams.

This rendering of Golden State Mutual, drawn by Williams, hangs for many years in the executive offices of the company.

Brother Paul R. Williams

The Oracle, September 1949 America’s Top Architect: Author of “I Am a Negro” Sees Better Race Relations, Has Plans for Homes to Cost Less Than $5,000 Each

“The designer is of the opinion there is only one kind of property restriction and that is the one which protects a community against inferior design or construction. And Brother Williams is active in the fight against all the other types of residential restrictions.”

The cover of the September issue of The Oracle featured Paul R. Williams. This magazine was devoted to the Omega Psi Phi, a prestigious African American fraternity. This was not the first time that Williams was the subject of an article about members of the fraternity.

Famed Architect Designs Homes for Westside Park

Las Vegas Review-Journal, December 14, 1949 New Westside Homes Project Gets Under Way

“The plans, as drawn by Williams are the realization of many months of study … only his personal interest in this project makes it outstanding … The houses will be of concrete block or masonry construction with Tropicool roof, steel casement windows, steel kitchen cabinets, air conditioning and all electric heat.”

New Insurance Building’s Lobby Murals Unveiled

Los Angeles Times, August 20, 1949

“Artist Hale Woodruff’s mural depicting The Negro in California History was unveiled yesterday when Golden State Mutual Life Insurance Co. officially opened its new five-story building … Celebrities on Hand: Norman D. Houston, president of the company; Paul R. Williams, nationally known architect who designed the building;…”

Glass House, New Canaan, Connecticut

Philip Johnson, an important 20th century architect known for his designs and philosophy, influenced the course of American architecture. Collaborating with Henry-Russell Hitchcock, Johnson wrote the celebrated exhibition catalog: The International Style: Architecture Since 1922 (1932). Hitchcock and Johnson were the first to describe and popularize the style.

A student of Walter Gropius and Marcel Breuer at Harvard’s School of Design, Johnson began designing his Connecticut residence after graduating in 1943. The Glass House was completed in 1949 and was an immediate sensation. The house was a simple rectangular structure built of 18-feet-wide, floor-to-ceiling, plate-glass sheets secured between black steel piers. It was considered a key postwar building. Built as a single room with a brick mass containing the fireplace and bathroom, the interior was open with cabinets and bookshelves serving as room dividers.

The Glass House was added to the National Register of Historic Places as the “epitome of modernism, its simplicity and purity of form unparalleled in domestic architecture.” Philip Johnson described his home and the surrounding complex as “the diary of an eccentric architect,” a material record of his evolving architectural philosophy.

Eames House, Pacific Palisades, California

In 1945 John Entenza, the publisher of Arts and Architecture magazine, commissoned eight architects to participate in the innovative Case Study House program. The purpose of the program was to rethink and re-engineer the concept of the home for post WW II America. The first group of architects were selected for their design talent and their ability to take “…a plot of God’s green earth and create good living conditions for eight American families.” Over 18 years, 34 houses were designed by some of the most influential mid-century architects.

Charles and Ray Eames, a husband and wife design team, created one of the original eight Case Houses. Built along the California coast in Pacific Palisades, the completed house was unveiled in the May 1949 issue of Arts and Architecture. The steel-framed, modular, International-style Eames House became one of the most famous Case Houses. Modular in design with an open floor plan, the one and two-story residence/studio was created from two steel-framed, rectangular boxes connected by an outdoor “room.” The public areas of the residence werelocated on the lower floor with the private bedrooms and baths upstairs.

Built of glass, stucco, metal and synthetics, the Eames House used many prefabricated industrial materials developed during the war and now available to the construction industry. This design was often cited as the most successful of all the 34 Case Study Houses in adapting available industrial materials to residential construction. The Eames’ innovative, flexible use of available materials was embraced by the American public as a “kit-of-parts” concept easily adapted to different sites and environments. Best known for industrial designs, the Eames House was the couple’s only architectural work.

Something Clients Want

Time, January 26, 1948

“Some architects have been known to sniff at Williams’ work; esthetically it breaks no new ground. But Williams, who does not like the severity of modern designs, makes no bones about his ability to work over old ground. He gives a new look to Early American, Spanish, Cape Cod, and judges his work by one standard: ‘If I build the kind of house a client wants, I’m a good architect.’ Clients seemed to agree: last year Williams grossed $140,000 (his staff of 20 includes two Negroes, a Chinese, two Germans, four Jews), netted around $50,000.”

Portrait to Be Unveiled

Los Angeles Times, April 30, 1948

“A portrait of Paul Williams, Los Angeles architect, will be added to the exhibition of paintings of outstanding Negro Americans now being shown at the Public Library. The portrait will be unveiled at 8 p.m. tomorrow, Artist Betsy Graves Reyneau announced.”

This painting is now part of the permanent collection at the National Portrait Gallery in Washington, D.C.

Scroll to Top