[/timeline_event]
Mies van der Rohe designs Crown Hall as a two-level, rectangular structure with industrial simplicity. The building’s sole ornamentation is the exposed, black-painted steel frame filled with large sheets of glass of varying transparency. On the top level the architect creates an open, unobstructed, flexible work space that encourages collaboration and cooperation between students and faculty. Mies van der Rohe describes this pavilion-like design as a universal space. The lower level contains rooms for building services/operations, bathrooms, administrative offices, wood and model shops and smaller lecture rooms.
One of the most important architects of the 20th century, Mies van der Rohe considers S.R. Crown Hall an “exceptional” precedent for the buildings he will design. He writes that this Hall is “the clearest structure we have done, the best to express our philosophy.” The building is added to the Park Services’ National Register of Historic Places.[/timeline_event]
