[/timeline_event]
The structure will be of reinforced concrete, finished on the exterior in pressed brick and art stone …”[/timeline_event]
The Lovell Beach House is completed in 1926 and architectural historians consider it Schindler’s greatest work. The suspended house of unsurfaced, poured-in-place concrete and iron rods is elevated above the beach on columns. Schindler describes the open plan residence as a health house—the perfect setting for the Lovells’ way of life based on sport, health and nature. Both the Lovells and Schindler believe that social problems can be solved with architectural design.[/timeline_event]
In the 1920s Woodside is one of the wealthiest small towns in America and the client directs the architect to design an appropriate mansion to represent his new social and economic position in California society. The 17,250 square-foot, 30-room residence is the perfect setting for Jackling’s extensive art collection.
The Jackling House is currently owned by the late Steve Jobs, CEO Apple Computers. Jobs calls the house “one of the biggest abominations of a house I’ve ever seen” an opinion not shared by preservationists fighting to preserve it.[/timeline_event]
