When Williams was deciding on his career path, the profession was almost exclusively white and male. African Americans were typically trained in the skilled building trades. In this 1899 photograph, students are learning bricklaying and masonry skills at the Hampton Institute.[/timeline_event]
[/timeline_event]
The massive A&A, an example of the brutalism-style, is a 36-level building constructed of hammered, poured concrete made with a special aggregate of mica, seashells, stones and branches of coral. The building has both a tactile and optic quality. Yale architecture historian Vincent Scully describes the building’s surface as “one of the most inhospitable, indeed physically dangerous ever devised by man…The building repels touch: it hurts you if you try.” (Gray Room, Autumn, 2000)
Before the building opens in 1963, it is widely praised as an example of innovative modern design. Speaking at the building’s dedication, however, British architecture critic Nicholas Pevsner shocks the attendees by criticising the Rudolph design. Though the building would win a First Honor Award from the AIA, it would be panned by many faculty and students who describe their studios as too small, too inhospitable and too inflexible. The building is viewed as a failure until the late 1980s when it is rediscovered by a new generation of Yale students and faculty.[/timeline_event]
Kahn, an important figure in modern architecture, works with other young architects forming the Architectural Research Group (ARG) in Philadelphia in the early 30s. ARG members are influenced by the ideas of contemporary European designers. Though the group disbands by 1934, Kahn’s work remains influenced by progressive architectural philosophy. By 1960 Kahn is a long-time member and fellow of the American Institute of Architects.
To realize Jonas Salk’s vision for an Institute fostering cross-disciplinary scientific collaboration, Kahn designs two mirror-image buildings flanking a courtyard. Each building houses a mix of laboratory space and support services. Towers with ocean views contain individual spaces for study and contemplation. To provide a welcoming, inspirational environment, Kahn harnesses light and space to create open, airy rooms. The architect’s selection and use of pozzuolanic concrete, unfinished and unsealed teak, lead glass and steel are dramatic, durable and low maintenance.
The synergy of Salk’s and Kahn’s collaboration produces “a facility uniquely suited to scientific research.” (www.salk.edu)[/timeline_event]
