[/timeline_event]
Architect Bertram Grosvenor Goodhue, in association with Carleton Winslow Sr., is chosen as the chief designer. He is fascinated by the festive Spanish Revival and Mission-style architecture of California and selects it as the unifying design for the exposition buildings. His use of Spanish inspired churrigueresque detail on the buildings creates a sensation and inspires a regional and national popularity for Spanish and Mission Revival buildings—a craze that endures throughout the 1920s.
These images are not from the original exposition but record a remodel (1933-1935) of Winslow’s original designs by architect Richard S. Requa.
(Thanks to Will Chandler, project historian and art director, for his insights into the 1990 to 1996 reconstruction of the Exposition’s buildings.)[/timeline_event]
