Paul Revere Williams
About Gallery News Resources Education Timeline Exhibition Media Contact Us

Gallery

Guardian Angel Cathedral, Las Vegas, NV

Gallery » Guardian Angel Cathedral, Las Vegas, NV

Guardian Angel Cathedral, Las Vegas, NV: Photograph courtesy of University of Nevada Las Vegas Architecture Studies Library Guardian Angel Cathedral, Las Vegas, NV
Photograph courtesy of University of Nevada Las Vegas Architecture Studies Library
Guardian Angel Cathedral, Las Vegas, NV: Photographer: Patricia McRae Baley, 2010 Guardian Angel Cathedral, Las Vegas, NV: Photograph: Patricia McRae Baley, 2010 Guardian Angel, interior: Photographer, David Horan 2011 Guardian Angel, interior: Photographer David Horan, 2011 Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jan Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, March 17, 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas Guardian Angel Cathedral, under construction, ca. summer 1963: Photographer, Jay Florian Mitchell, Courtesy of Nevada State Museum, Las Vegas

In the history of 20th century Nevada, Morris Barney Dalitz is often called “Mr. Las Vegas” for his efforts to shape the city into a modern metropolis. A Detroit transplant, Moe was a legendary bootlegger, racketeer and early investor in the Las Vegas gaming industry. After it was revealed in a 1950s Senate hearing that Dalitz was a top man in various crime syndicates, he decided to improve his public image and became an active philanthropist. Using his own money along with union pension funds, he underwrote the construction of the Sunrise Hospital, Las Vegas Country Club and made large donations to the Las Vegas Public Library System. He kept a California public relations firm on his payroll to inform the Las Vegas community of his on-going efforts to help his adopted city. (Nevada Journal online, 1996) In 1961 he donated land and funds to build the Paul R. Williams’ designed Guardian Angel Shrine for the Catholic Diocese of Reno-Las Vegas. 

Dalitz and Williams' Las Vegas relationship may date to the merger in the late 50s of the Royal Nevada with its neighbor on the Strip the Stardust Hotel. The Williams' and John Replogie designed Royal Nevada, built in 1955, was one of the last low profile hotels. The Stardust was one of the largest with 1000+ rooms, the largest pool and the largest casino in Nevada. The smaller complex was ultimately consumed by the giant "star and planet" themed hotel. Familar with the Williams' work on the Royal Nevada, Dalitz approached the architect with his plan to help the Catholic Diocese and replace their recently razed home church—St. Viator.

When St. Viator was built in 1955 on the site of the former the city dump, the land proved to be unstable. Within 6 months of completion St. Viator was condemned and torn down. Churchless, Reverend Richard Crowley, approached Dalitz to donate land on the Strip. The idea of a conveniently located Catholic church for his casino workers appealed to the Jewish Dalitz. In 1961 he donated land near the Desert Inn and by October 1963 Guardian Angel Shrine held its first mass. Acknowledging the building's importance to the community, Bishop Norman McFarland designated the Guardian Angel Shrine and a newly constructed St. Viator co-cathedrals for the Diocese of Reno-Las Vegas in 1977. (Las Vegas Sun, September 17, 2005)

Paul R. Williams’ use of the dramatic A-frame design was the perfect choice for the building’s Strip location. With seating for 1100 congregants, the building easily holds its own against the glitz, glamour and neon of the surrounding hotels and casinos. A large, colorful mosaic over the entrance by Los Angeles artist Edith Piczek represents the Guardian Angel with three figures: Penance, Prayer and Peace. A second mural above the main alter depicts the Guardian surrounded by “swooping angels.” Stained glass windows by Isabel Piczek were installed in the twelve triangular recesses bisecting the A-frame. Each window illustrates a Station of the Cross with gambling themes illustrating the story. (Danny and Rose Marie Thomas donated funds for Window XII.) The sisters describe their combined aesthetic as Mystic Realism, an art form “that will communicate in inner levels never touched before…ending in happiness—your happiness. The real artwork is not made from glass, paint or tile” but is found within the viewer. (A personal note from the artists on the Roman Catholic Diocese of Las Vegas web site, 2005)

The Guardian Angel Cathedral was renovated in 1995 for $1.3 million, a tribute to the building's importance. While the Cathedral no longer attracts many employees from nearby casinos, it is popular with tourists.

A website The Mystery Worshipper provides one visitor's impressions of attending a 2001 worship service in the Guardian Angel Cathedral.

For information about the photographs from University of Nevada Las Vegas Architecture Studies Library (images 1) visit their website: www.library.unlv.edu/arch

« Back
Provided by The PRW Project | Terms of Use
Copyright © 2009-2012 The PRW Project. All Rights Reserved
Login  |  Powered by RocketFuel®