Gallery |
|
Dr. Ernest Holmes was the founder of the Church of Religious Science. Dr. Holmes defined Religious Science as a "correlation of laws of science, opinions of philosophy and revelations of religion applied to human needs and the aspirations of man." (Los Angeles Times, April 8, 1960) Both he and his wife, Hazel, would devote their lives to their religious work.
In 1957, Paul R. Williams designed this circular building symbolizing the wholeness, unity, unending, and all-inclusive power of love basic to Holmes' Science of Mind teachings. According to a series of 1959 articles in the Los Angeles Times, the building was slated to be a notable religious structure in Southern California. The dome would suspend 50 feet over the main auditorium that was 100 feet at the widest dimension. Another unique feature was the inclusion of facilities for closed-circuit television a new technology in the 1950s. The Church would be centered in a lush garden to surround the congregation in greenery with sculpture featuring the great philosophers of history.
The total cost of the Williams' three phased construction program was $3.5 million with the church alone costing $1 million.
