Paul Revere Williams
About Gallery News Resources Education Timeline Exhibition Media Contact Us

Gallery

Roosevelt Naval Base, Long Beach, CA

Gallery » Roosevelt Naval Base, Long Beach, CA

Roosevelt Naval Base, 1943 aerial view looking E: Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-10 Roosevelt Naval Base, 1943 aerial view looking E
Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-10
Roosevelt Naval Base, 1945 overhead aerial view, piers under construction: Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-11 Roosevelt Naval Base, facing S-SW with Pier 9 in distance: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-3 Roosevelt Naval Base, view from pier 7: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-2 Roosevelt Naval Base, front of building 2: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-9 Roosevelt Naval Base, facing NE: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-6 Roosevelt Naval Base, Administration Building, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, Administration Building, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, Exterior, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, view from top of tower facing NE: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-5 Roosevelt Naval Base, view of building 1 facing NE: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3-8 Roosevelt Naval Base, Recreation and Bowling Alley, facing SW: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3N-1 Roosevelt Naval Base, Post Office, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, Recreation and Bowling Alley, entrance: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3N-2 Roosevelt Naval Base, Interior, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, Officer's Club, facing E: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-1 Roosevelt Naval Base, Officer's Club, main doorway: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-8 Roosevelt Naval Base, Library, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California Roosevelt Naval Base, Recreation and Bowling Alley, facing N: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3N-4 Roosevelt Naval Base, Officer's Club, facing NE: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-2 Roosevelt Naval Base, Officer's Club, pool area: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-9 Roosevelt Naval Base, Officer's Club, main entrance facing S: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-7 Roosevelt Naval Base, Officer's Club facing NW: Photographer: William B. Dewey, Library of Congress Prints and Photographs Division; Historic American Buildings Survey: HABS CAL, 19-LongB, 3O-4 Roosevelt Naval Base, Lounge, 1944: Photographer: Maynard L. Parker, The Huntington Library, San Marino, California

Adrian Wilson and Paul R. Williams participated in the design of the Roosevelt Naval Base in Long Beach, California, as members of Allied Engineers. The original purpose of the base was to provide recreational facilities for the Pacific Fleet. With the US entry into World War II in 1941, the scope of activities at the base was enlarged and it became the “Flag Ship” for the 22 naval activities comprising the Naval Operating Base (NOB). During its life time about a third of the base was devoted to administration and recreational facilities and the rest to industrial warehousing and ship repair.

Allied Engineers, a cooperative of California architects, faced many engineering and cost considerations when designing the complex. Their charge was to bring together a variety of naval shore activities, currently scattered around the harbor, on the man-made Terminal Island. The permanent buildings were supported on pilings and designed to withstand earthquake forces. Exterior walls were made of reinforced concrete with forms made with standard size plywood to control cost.

The Administration Building (image 7 and 8) housed the offices of the Commandant of the NOB, the Fleet Post Office and the brig. The main lobby of the Administration Building was decorated with wall panels of ¼-inch plywood and floor and stairs of travertine.

The Recreation and Bowling Alley buildings were designed primarily for peacetime use as a place for entertainment and health for the Pacific fleet personnel. It included covered arcades, an enclosed patio, fully tiled swimming pool as well as an auditorium and a gymnasium large enough for three regulation size basketball courts. There was also a library (image 18) and reading room for enlisted men. The walls of the library were made of slashed grained plywood in a natural finish with floors of colored concrete.

Image 22 shows the porte cochere of the Officers’ Recreation Building. An article in a 1944 issue of Architectural Record describes the affect as “simplicity with mass concrete and fenestration providing the visual interest.” This building was planned to provide activities for fleet officers and their guests and contained dining and grill areas, lounges, and fountain bar with waterfront views. While much of the interior decoration was made of plywood it was stained to simulate mahogany or laid in parquet patterns on the floors (images 15 and 24).

« Back
Provided by The PRW Project | Terms of Use
Copyright © 2009-2012 The PRW Project. All Rights Reserved
Login  |  Powered by RocketFuel®